Full Text Searchable PDF User Manual

LED Control
Installation and operating instructions
V 1.1


1. General remarks ....................................................................................4
1.1 Safety information ...................................................................................................................... 4
2. Installation preparations ......................................................................5
2.1 Contents ....................................................................................................................................... 5
2.2 Component sizes ........................................................................................................................ 5
3. Installation ..............................................................................................6
3.1 Electrical installation .................................................................................................................. 6
3.2 Mechanical installation .............................................................................................................. 8
4. Operating the system ...........................................................................9
4.1 Control screens ........................................................................................................................... 9
4.2 Operating modes and menu items ......................................................................................... 9
4.3 Further functions ......................................................................................................................10
5. Technical data .....................................................................................11
6. Disposal information ..........................................................................11
7. Warranty ...............................................................................................12
8. Notes .....................................................................................................13
Table of contents

LED Control
- Installation and operating instructions
4
EN
1. General remarks
This document contains the installation and operating instructions for the LED Control.
It is to be handed over to the end user (tenant, owner, building management, etc.) once
the installation has been completed. This document is part of the system and must be
kept readily available. Though its contents have been checked for consistency with the
described hard- and software, deviations cannot be ruled out, meaning that no guarantee
of complete consistency can be given. This documentation is updated on a regular
basis. Necessary corrections and useful addenda will always be included in subsequent
versions. They are also available at
www.getair.eu/downloads/
.
1.1 Safety information
The safety information regarding the operation and maintenance of the system contained
in these installation instructions are to be followed. Before any work is carried out on
the unit / system, the instructions and safety information are to be read carefully in full.
Non-compliance with the safety information can lead to harm/damage to persons and/
or equipment.
Assembly, electrical installation and system start-up should only be performed by skilled
persons. These are people with relevant safety training and qualified to install, commission
and label equipment, systems and cabling in accordance with current safety standards.
The following list contains descriptions of the symbols and terms used in these instruc-
tions:
Hazard symbol
Caution
This hazard symbol warns about
the danger of injury.
Electricity
This hazard symbol warns about
the danger of electrocution.
Warning symbol
Information
This warning symbol indicates im-
portant information.

Installation and operating instructions
-
LED Control
5
EN
2. Installation preparations
2.1 Contents
Before starting installation, please check whether all components are present, as other-
wise it will not be possible to complete the installation.
Article name
Item Content
Quantity
LED Control
1 LED screen
1
2 Control element
1
3 Frame
1
4 Power supply
1
2.2 Component sizes
Name
Width
(mm)
Height
(mm)
Depth
(mm)
Ø
(mm)
LED screen
50
50
46
-
Control element
70
70
34
-
Frame
80
80
12.5
-
Power supply
-
-
32.5
53.5
1
3
2
4

LED Control
- Installation and operating instructions
6
EN
3. Installation
Power must be turned off during all installation work.
The SmartFan is controlled via BUS cabling, meaning that cables can be laid from one unit
to the next. The maximum length of a BUS cable is 1000 m. 4-pole cables must be used.
The use of LiYY 4 x 0.25 mm² data cables is recommended.
the cross-section of the cables should be determined
according to cable length and safety requirements.
A converter (power supply) is used to decrease voltage from 230 V to 12 V. It can supply
power to 6 SmartFan units. In larger installations, one further power supply will be needed
for each six units.
3.1 Electrical installation
All electrical work must be performed by a qualified electrician. Make sure that all wiring
is done correctly.
Control element
Power supply
rot
schwarz
+12V (4)
Bus B (3)
Bus A (2)
GND (1)

Installation and operating instructions
-
LED Control
7
EN
When connecting the control unit to the SmartFan unit, a
4-pole 3.50 mm straight plug
must be used. The plug must be wired as shown below. When connecting the plug to the
fan unit holder, the screws should point downwards.
When continuing the cable to a further SmartFan unit, the colours of the input and output
wires in each opening must match each other.
incorrect wiring can cause damage to the fan unit.
The LED Control can be placed at an arbitrary place within the BUS-network. It is possible
to run the cables in row, ring-shaped or also radial.
GND (1)
Bus A (2)
Bus B (3)
+12 V (4)
+12 V (4)
Bus B (3)
Bus A (2)
GN
D (1)
Outgoing wir
es
(Next Smar
tFan)
Incoming wir
es
Control
Control
Control

LED Control
- Installation and operating instructions
8
EN
SmartFan fan units are equipped with a DIP switch on the top. The fan unit has to be set to
group 1 and a starting direction has to be chosen, if you are using the LED Control.
3.2 Mechanical installation
Install the control unit at standard wall height. Both the TOUCH and the LED control units
can be installed using a electronics box. The power supply can be placed in the electro-
nics box.
the installation is to be done in such a way that the 12V outPut
cable and the 230V inPut cable are not on the same side of the
Power suPPly (install the 230 V cable underneath).
To avoid having to use an electronics box, you can use a DIN rail power supply instead of a
standard power supply. This can also be purchased from getAir GmbH & Co. KG. However,
such a power supply requires a further cable duct / slit for the cable to the fuse box.
A further way of avoiding the use of an electronics box is to install the power supply
behind a power socket nearby. In this case the control unit can be installed at standard
height in a single deep pattress box.
After installing the power supply (converter) and the control element, place the frame over
the control element and insert the control screen into the control element.
Group setting
Fan direction

Installation and operating instructions
-
LED Control
9
EN
4. Operating the system
4.1 Control screens
1
LEDs
The LEDs show the selected fan speed.
2
Arrow pointing upwards
Increase fan speed.
3
Eco-Mode
Puts the system into heat recovery
mode. The LEDs become green.
4
Full-Blast-Mode
Puts the system into full blast mode.
The LEDs become blue.
5
Arrow pointing downwards
Decrease fan speed..
4.2 Operating modes and menu items
Eco-Mode
Every 70 seconds, the fan changes the airflow direction, ensuring heat recovery.
Full-Blast-Mode
The system runs in just one direction, allowing a room to be thoroughly ventilated. Heat
recovery is not available in this mode. In the main menu the SmartFan‘s starting direction
can be reversed through touching the Full-Blast -Mode icon.
2
1
5
4
3

LED Control
- Installation and operating instructions
10
EN
4.3 Further functions
Full-Blast-Mode: changing airflow direction
To change the initial direction of the airflow when in full blast mode, press the left triangu-
lar button and the round button concurrently. The LEDs blink as confirmation. To reverse
the direction, press the right triangular button and the round button concurrently. Here
again, the LEDs blink as confirmation.
Filter change display
When a filter change is required, the middle two LEDs start blinking. Once the filter has
been changed, this is confirmed by pressing the two round buttons in the middle concur
-
rently. In doing so, the internal meter is also reset.
the oPtimum time to rePlace the filter may Vary through the
Present enVironmental conditions.

Installation and operating instructions
-
LED Control
11
EN
5. Technical data
Operating voltage [V]
12 DC
Power consumption [W]
2
Control output
RS 485 AB
Software class
A
Permissible operating temperatures [°C]
0 ... 40
Type of protection
IP 40
Contamination level
2
Dimensions [mm]
50 x 50 x 46
(without frame)
Colour
White
Conformity
6. Disposal information
Packaging should be sorted before disposal. Electronic devices or batteries
do not belong in normal household refuse. Should you want to dispose
of your ventilation unit, please do so in accordance with current national
regulations. Contact the appropriate authority.

LED Control
- Installation and operating instructions
12
EN
7. Warranty
getAir GmbH & Co. KG provides a 2-year warranty on the control unit. The warranty will
expire in the following cases:
• Damage caused by the incorrect / improper handling and use or through non-
compliance with the installation and operating instructions.
• The use of components or accessories which are not recommended, licensed or
approved by getAir GmbH & Co. KG
•
Modifications or reconfigurations of the SmartFan ventilation system
• The use of non-original replacement parts in the SmartFan ventilation system.
• Damage caused by force majeur or environmental influences.
• Damage caused by chemical or electrochemical effects of liquids or gases.
outside germany, the warranty is coVered by the warranty
regulations of the country in which the system was sold. in
such a case, Please contact the dealer in your home country.
Complaints
Please check the contents of the delivered material in accordance with the delivery note.
Also check for any transport damage. Report any missing items to your supplier within
four weeks of delivery.
Documentation
The above documentation describes the functionality of the standard configuration. To
maintain clarity, we are unable to take account of every possible installation, operating
or maintenance configuration. The diagrams in this documentation may deviate slightly
from the design of the product you have purchased. Even when this is the case, the func-
tions basically remain the same.
Service
For technical advice, please contact your supplier, dealer or our service staff.

Installation and operating instructions
-
LED Control
13
EN
8. Notes


Subject to change. No liability is assumed for the information contained herein. The partial or complete reproduction (prints,
photocopies, electronic recording) requires prior written approval. No liability is assumed for printing errors.
Published by:
getAir GmbH & Co. KG
Krefelder Straße 670
41066 Mönchengladbach
E-Mail: info@getair.eu
Website: www.getair.eu
Picture credits:
© getAir GmbH & Co. KG 2015
All rights reserved:
© getAir GmbH & Co. KG 2015
