PDF User Manual

  1. Home
  2. Manuals
  3. clivus multrum M100 Installation Manual

clivus multrum M100 Installation Manual

M150\ CK100\ CL400\ CL300\ CK500

Made by: clivus multrum
Type: Installation Guide
Category: Toilets
Pages: 2
Size: 0.32 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

 

 

Installation Guide 

M100/M150 

– CL300/CL400 – CK100/CK500

                                                                                                                                                                                          

 

 

 

                    

 

__________________________________________________________________________________________ 
 

Clivus Multrum International AB 

Phone: +46 8 501 642 29 

VAT-nummer: SE556095862001 

Box 2090 

Web: 

www.clivusmultrum.eu

  

IBAN: SE02 1200 0000 0136 83600195 

19102 Sollentuna 
Sweden 

E-mail: 

info@clivusmultrum.eu

 

 

Swift: DABASESX 
 

 

Material required: 

-

 

1x M100 (or M150) composting tank 

-

 

1x CL200/CL400 floor-mounted (or 
CL300/CL310 bench-mounted) toilet 

-

 

1x CK100 (or CK500) ventilator 

-

 

Ø100mm ventilation pipe & clamps 

-

 

Gravel or pebbles (handful) 

-

 

Wood chips (~150 litres) 

-

 

Ø250mm discharge pipe 

-

 

Garden hose (optional) 

 
 

Step 1: Planning & Preparation 

 
The below diagram shows a schematic of a 
typical installation. 
 
The fan can be put directly above the tank 
or at the top of the ventilation pipe. The 
toilet has to be placed right above the 
composting tank. 
 
For compost removal, it is important that 
access to the white hatch is possible. There 
are no extra space requires along the other 
sides. 
 
It is possible to put the toilet immediately 
above the tank without using a discharge 
pipe. 
 

 
 
 
 
 

 
 

 

 
 

Step 2: Cutting pipe openings 

The below diagram shows the top of the 
composting tank. Clivus Multrum delivers 
the tanks without the openings for the 
ventilation and discharge pipes to allow 
maximum flexibility when installing. 

The typical placement of the pipe openings 
is indicated with the circles. However, if 
placement requires it is not a problem to 
cut the openings elsewhere on the top of 
the tank. The ventilation opening can also 
be placed at the top end of the side of the 
tank.  

The openings can be cut with a sharp knife 

 


background image

 

 

Installation Guide 

M100/M150 

– CL300/CL400 – CK100/CK500

                                                                                                                                                                                          

 

 

 

                    

 

__________________________________________________________________________________________ 
 

Clivus Multrum International AB 

Phone: +46 8 501 642 29 

VAT-nummer: SE556095862001 

Box 2090 

Web: 

www.clivusmultrum.eu

  

IBAN: SE02 1200 0000 0136 83600195 

19102 Sollentuna 
Sweden 

E-mail: 

info@clivusmultrum.eu

 

 

Swift: DABASESX 
 

 

of a saw.  

Step 3: Placement of composting tank 
 

The composting tank is self-supporting and 
can be placed directly on the floor without 
additional support or isolation. 

The picture shows an 
example of how the tank 
can be placed. 

Note that the tank is not 
strong enough to support 
the toilet. The toilet needs 
to be supported by the 
floor or bench. 

 
Step 4: Discharge pipe (optional) 

Whether a discharge pipe is necessary 
depends on the placement of the toilet 
fixture relative to the tank. As long as the 
toilet is vertically above the tank there is 
no limitation for the length of the discharge 
pipe. It is not problem to place the 
compost tank in the basement for a toilet 
on the upper floor. 

Most important is to fix the discharge pipe 
such that it does not risk falling inside the 
composting tank. 

Step 5: Toilet placement 

CL300/CL310: Place the toilet on a bench 
to support it. 

CL200/CL400: Place the toilet on the floor. 

Ensure that the toilet’s discharge is fitted 
inside the discharge pipe or composting 
tank opening. 

Step 6: Ventilation 

Ventilation is important for a healthy 
composting process, and to avoid foul 
odours to enter the bathroom. 

CK100: Cut the ventilation pipe at the 
place where the ventilator shall be placed. 
Join the pipe and ventilator on both sides. 

CK500: Fix the ventilator to the top of the 
pipe.  

Ensure a good seal to avoid false air draw. 

Place, fix and seal the ventilation pipe onto 
the opening on the tank. 

CK100: Connect the fan to a circuit breaker 
according to the wiring diagram that can 
be found on the inside of the junction box.  

Step 7: Garden hose (optional) 

For excess leachate removal connect a 
garden hose to the tap at the bottom of the 
tank. 

Step 8: Commissioning 

Through the white hatch, place the floor 
plate in the tank so that the drain holes are 
on the side of the hatch. 

To avoid the drain holes from clogging up, 
place a hand full of gravel or pebbles so 
that they are covered. 

Using the top hatch, fill the tank with 
approximate 150 litres of wood chips as 
shown in the below drawing.