PDF User Manual

  1. Home
  2. Manuals
  3. Tecnoclima SR-UT Series Technical Information Assembly, Use And Maintenance Instructions

Tecnoclima SR-UT Series Technical Information Assembly, Use And Maintenance Instructions

SR-UT/K Series\ SR-UT 46\ SR-UT 66\ SR-UT 86\ SR-UT 106\ SR-UT/K 26\ SR-UT/K 36\ SR-UT 36\ SR-UT 26\ SR-UT/K 46\ SR-UT/K 66\ SR-UT/K 86\ SR-UT/K 106

Made by: Tecnoclima
Type: TECHNICAL INFORMATION ASSEMBLY, USE AND MAINTENANCE INSTRUCTIONS
Category: Heating System
Pages: 12
Size: 2.79 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

 

1.

0

 

 

TECHNICAL INFORMATION 

ASSEMBLY, USE AND MAINTENANCE INSTRUCTIONS 

 

 

HEATING UNITS 

WITH ATMOSPHERIC BURNER 

 
 

SERIE SR-UT SR-UT/K 

 

 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Manual attached to the USE AND MAINTENANCE INSTRUCTIONS of the UT and UT/K series 

 

 

As to what is not expressly mentioned in this manual, it is valid what is set forth in the manual ASSEMBLY USE AND 

MAINTENANCE INSTRUCTIONS of the UT and UT/K series appliances

 

 

 


background image

GENERAL INFORMATION

 

2.

0

 

Dear Customer, 
Thank you for choosing a TECNOCLIMA product. 
This  instruction  handbook  includes  instructions  and  suggestions  that  shall  be  complied  with  for  simpler 
installation and to ensure the best use of the appliance. 
 
Thank you.

 

                                                                                                                                                Tecnoclima S.p.A.

 

 
 
 
 

3.

0

 

COMPLIANCE AND PIN NUMBER 

 
The machine complies with the Directives, Rules and Regulations listed in the Declaration of Conformity that 
can be requested to the Producer. The PIN number of the EC certification, if any, is included in the technical 
data plate.

 

 

4.

0

 

PRODUCT RANGE 

 

Throughout this manual, reference is made to the TYPE, to which the TRADE NAME specified in the table is 
connected: 
 

TRADE NAME 

TYPE 

TRADE NAME 

TYPE 

SR-UT 26 

SR-UT/K 26 

SR-UT 36 

SR-UT/K 36 

SR-UT 46 

SR-UT/K 46 

SR-UT 66 

SR-UT/K 66 

10 

SR-UT 86 

SR-UT/K 86 

11 

SR-UT 106 

SR-UT/K 106 

12 

 

 

5.

0

 

WARRANTY 

 
The  appliance  is  covered  by  a  specific  warranty,  whose  terms  are  specified  in  detail  in  the  warranty 
certificate or in the delivery contract, which should be read with great care.

 

 

6.

0

 

GENERAL WARNINGS 

 

 

As for general warnings, refer to the user’s manual of the UT and UT/K series. 

Any operation on the appliance shall be performed only by qualified and skilled workers.

 

 

7.

0

 

BASIC SAFETY RULES 

 

 

As for basic safety rules, please refer to the user’s manual of the series

 

UT and UT/K

 

 

8.

0

 

DISPOSAL INSTRUCTIONS 

 

 

The appliance contains electric components; therefore it shall not be disposed of as household waste. As for 
disposal methods, refer to the local laws on special waste. 

 


background image

GENERAL INFORMATION

 

9.

0

 

DESCRIPTION 

 
These machines are heating units to be used for air heating. They are essentially thermal units of exchange 
between the combustion products of an atmospheric burner and the air flow generated by a ventilation unit 
not included in the scope of supply. The air to be heated is sucked by the ventilation unit and, when it laps 
the hot surface of the heat exchanger, it is heated - increasing its temperature; then it can be distributed 
both directly and through proper channels. Trough this heating system, the plant costs can be remarkably 
reduced and a reliable operating economy can be reached. 

 

WARNING

The heating sections type 1-2-3-4-5-6 are designed to be installed indoors, and protected from atmospheric 
agents. 
Heating units type 7-8-9-10-11-12 have been conceived to be installed outdoors.

 

10.

0

 

STRUCTURE 

 

 

 
 
 
 
 
 
 

Legend of the components: 

 

1. 

Air inlet flange 

2. 

Smoke exhaust 

3. 

Electric panel 

4. 

Atmospheric burner 

5. 

Lower frame 

6. 

Air outlet flange 

7. 

Heat exchanger 

 


background image

GENERAL INFORMATION

 

11.

0

 

VOLUME AND WEIGHT 

 

TYPE 1-2-3-4-7-8-9-10: 

(This drawing represents the outdoor installation design) 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TYPE 

 

1-7 

2-8 

3-9 

4-10 

mm 

460 

460 

460 

460 

mm 

460 

460 

460 

460 

mm 

840 

840 

840 

mm 

464 

464 

464 

464 

mm 

435 

515 

695 

940 

mm 

464 

464 

464 

464 

mm 

350 

460 

655 

900 

mm 

27 

27 

27 

27 

 

TYPE 

 

Net weight 

kg 

95 

105 

130 

155 

 

TYPE 

 

10 

Net weight 

kg 

105 

115 

140 

170 

 

 


background image

INSTALLATION AND SETTING INSTRUCTIONS 

11.

0

 

VOLUME AND WEIGHT 

 

Type 5-6-11-12: 

(This drawing represents the outdoor installation design) 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TYPE 

 

5-11 

6-12 

mm 

460 

460 

mm 

460 

460 

mm 

895 

895 

mm 

464 

464 

mm 

1300 

1540 

mm 

464 

464 

mm 

1260 

1500 

mm 

27 

27 

 

TYPE 

 

Net weight 

kg 

235 

260 

 

TIPO 

 

11 

12 

Net weight 

kg 

260 

290 

 


background image

INSTALLATION AND SETTING INSTRUCTIONS 

 

12.

0

 

SPECIFIC TECHNICAL DATA 

 

TYPE 

 

1-7 

2-8 

3-9 

4-10 

5-11 

6-12 

ELECTRIC SUPPLY 

 

Single-phase 230V

50Hz 

Three-phase 400V

50Hz 3N 

MINIMUM AIR FLOW

1

 

m³/h

 

1.820 

2.920 

4.130 

5.900 

7.900 

8.750 

USE LIMITS 

 

 

 

 

 

 

 

max. pressure  

Pa 

+500 

installation temperature 

°C 

-15/+40 

suctioned air temperature 

°C 

-15/+30 

 

1)

 

Air flow shall be guaranteed by the Installer. Should a different air flow be required, please contact 

the Manufacturer. 

 

 
 

25.

0

 

STOP 

 

Do  not  stop  the  machine  by  disconnecting  it  from  the  power  supply,  since  the  thermal 
energy stored in the heat exchanger could dangerously overheat it, damaging the warm air 
heater.  Moreover  the  LIMIT  thermostat  could  be  triggered  and  it  might  be  necessary  to 
manually unblock it. 

 
 

26.

0

 

LOCATION 

 
The installation place must be chosen by the plant designer or by a person competent in this matter; this 
place  must  meet  the  requirements  specified  by  the  Standards  and  Regulations  in  force;  generally,  special 
authorisations are to be obtained (e.g. town-planning, architectural, fire-fighting, environmental regulations 
etc.) 
Therefore, before installing the appliance, it is advisable to request and obtain the necessary authorisations. 
 

We suggest not to install the machine: 

 

in places with aggressive atmosphere; 

 

in narrow places where the heater noise level can be magnified by reverberation and resonance; 

 

in  corners  where  leaves  can  deposit  or  any  other  materials  might  obstruct  the  air  opening,  thus 
decreasing the heater efficiency; 

 

 in pressurised areas; 

 

in depressurised areas; 

 

outdoors, if not provided with a protection against bad weather conditions (if they are not machines 
adequately conceived for such use). 

 

 
 

27.

0

 

RESPECT AREA 

 

The machine shall be easily and safely reached  without needing special  equipment (ladders  - 
movable  platforms  -etc.). 

Around  the  machine,  minimum  distances  shall  be  complied  with  so  that  the 

control and/or maintenance operations can be performed and that no obstacles block the air flow. 
 

Any  law  or  specific  regulations  (e.g.  fire  prevention)  shall  be  complied  with.  Consult  the  plant 
designer. 

 

 


background image

INSTALLATION AND SETTING INSTRUCTIONS 

28.

0

 

CONNECTION 

 
The electric and hydraulic connection is to be carried out in compliance with all the relevant Regulations and 
they should not be a hinder to the machine.

 

 
 

 

SAFETY FLOW GAUGE 

 
To  guarantee  a  correct  machine  operation  it  is  required  to  install  on  the  plant  a  device  (e.g.  air  gauge) 
breaking  burner  operation  in  the  event  that  air  flow  decreases  beyond  the  minimum  value  set  forth  in 
section SPECIFIC TECHNICAL DATA.

 

 

 
 

29.

0

 

TREATED AIR SUCTION – OUTLET DIRECTION 

 

 

 
 
 

IN 

Direction – suction direction of air to be treated 

OUT 

Direction – suction direction of treated air 

 

 
 

30.

0

 

ORIGINAL ACCESSORIES 

 
To install the accessories, follow the instructions included in the relevant package. 

 
 

37.

0

 

CONDENSATION CHECK

 

 
The  appliance  is  designed  to  be  operated  with  the  heating  capacity  and  the  air  flow  rate  specified  in  the 
Data  Sheet  chapter.  If  the  heating  capacity  is  too  low  and/or  the  air  flow  rate  is  too  high,  combustion 
products  may  condensate,  resulting  in  the  irreparable  corrosion  of  the  heat  exchanger.  If  the  heating 
capacity  is  too  high  and/or  the  air  flow  rate  is  too  low,  an  anomalous  overheating  of  the  heat  exchanger 
may occur, resulting in the activation of the safety devices and causing damage to the exchanger. 
 

It  has  to  be  checked  if  condensation  is  forming  inside  the  heat  exchanger  during  its 
functioning. This check should be performed by turning off the burner after half an hour 
of  continuous  functioning,  checking  if  there  is  any  trace  of  humidity  in  the  exhaust 
manifold.

 


background image

INSTALLATION AND SETTING INSTRUCTIONS 

38.

0

 

TRANSFORMATION GAS / FORCED GAS BURNER 

 
Burners  are  factory-configured  for  operation  with  natural  gas  G20.  The  transformation,  if  required,  to 
another type of fuel gas is installer’s responsibility and charge. Such transformation may be carried out only 
by  qualified  and  skilled  workers  strictly  observing  the  specifications  set  forth  in  the  instruction  manuals  of 
the burner and of the power ramp, if any, provided together with them.

 

 

 
 

40.

0

 

ELECTRIC CONNECTION 

 
Electrical  connections  should  be  made  by  qualified  personnel  and  in  compliance  with  the  relevant 
Regulations,  using  the 

ad  hoc

  terminals.  For  any  electrical  operation  to  be  performed,  refer  to  the  wiring 

diagram included in this manual and provided together with the appliance. 
 
 
 

 

Install a circuit breaker of the size required by the relevant regulations before the machine. 

 

Always connect the earth connection of the machine, leaving the earth wire slightly longer than the 

line wires, so that, should they be accidentally torn off, it will be the last to be detached. 

 

Have authorized personnel check that the wire sections and the electric plant are adequate for the 

max. absorbed power specified in the plate data. 

 

Take into account the polarity in the power supply connection (phase - neutral). 

 

The machine should compulsorily be connected to an effective earthing system. The Producer shall 

not  be  held  liable  for  damage  occurred  because  the  machine  is  not  equipped  with  an  earth 
connection. 

 

Electrical  wires  should  be  placed  so  as  not  to  come  into  contact  with  hot  and/or  cold  surfaces  or 

with cutting edges. 

 

In compliance with the electric Regulations concerning the installation, install a device ensuring that 

the machine is disconnected from the network, with a contact opening distance adequate to ensure 
the complete disconnection in overvoltage conditions III (Standard EN 60335-1) 

 

Water or gas pipes should not be used as earth connection of the machine. 

 

Use the dedicated cable glands to insert the supply and control wires in the machine. 

 

If you have any doubt, do not operate on the machine. Contact the manufacturer to receive further 

clarifications and/or additional information.

 

 


background image

INSTALLATION AND SETTING INSTRUCTIONS 

41.

0

 

FAN MOTOR CONTROL

 

 
In the electric panel there is an outlet for fan motor (MV) control.  
If the applied electric load is lower than that shown in the table set forth hereunder, such outlet can be 
used directly; otherwise it can be used to operate a relay and/or contactor. 

 

Fan motor power -  table: 

TYPE 

 

1-2-3-7-8-9 

4-10 

5-11 

6-12 

Power 

kW 

0,5 

0,75 

1,1 

1,5 

 
A paper version of the wiring diagram is included in the appliance. It is an integral part of these instructions 
and we recommend keeping it carefully. 

 
 

 

CHECKS

 

 
In order to ensure that the machine works properly, some basic parameters should be checked. Activate the 
machine and: 
 

 

Check that the ventilation unit starts after max. 30 s from the burner activation. 

 
While the warm air heater is normally working (after approx. 20 minutes of uninterrupted working), perform 
the following operations: 
 

 

Measure the air flow, as it is crucial to get an optimal room heating and furthermore is necessary in 

order to adequately cool the heat exchanger. The absence of any kind of resistance on the air flow 
generated by the fan is essential. Therefore, avoid any obstacles hindering air supply and return. 

 

Check that there is no fuel leakage. 

 

Check that the fuel flow is correct by reading the meter. 

 

Check the combustion parameters. 

 

Check that the installed safety devices do not operate anomalously. 

 

On the remote control panel, lower the set-point to a value lower than the room temperature and 

check that 

only the burner

 turns off and that the fan unit does not simultaneously stop. 

 

Check that the fan works for 3 minutes after the burner has stopped, before stopping as well. 

 

Check  that  the  thermal  gradient  is  equal  to  the  one  specified  in  the TECHNICAL  DATA  paragraph. 

The thermal gradient is the difference between the air outlet and air inlet temperature. Since the air 
outlet  temperature  is  not  constant  through  its  outlet  section,  in  order  to  get  this  value,  several 
temperature  measurements  have  to  be  carried  out  (throughout  its  outlet  sections)  and  then  the 
arithmetical mean has to be calculated. 

 

Check  that  the  air  pressure  gauge  of  the  burner  is  correctly  calibrated,  so  that  it  stops  if  the 

comburent air is not enough - since this might cause a non hygienic combustion     

 

All  the  checks  above  mentioned  should  be  performed  in  all  the  arranged  working 
conditions (max and min).

 

 
 


background image

TECHNICAL ASSISTANCE INSTRUCTIONS 

10 

 

45.

0

 

MAINTENANCE

 

 
Periodic  cleaning  and  maintenance  operations  are  to  be  performed  to  preserve  the  equipment  and  ensure 
its correct functioning. These operations are to be performed by skilled and trained personnel, who have to 
start working when the equipment has cooled down and after disconnecting the electric and fuel supply. 
Periodically  check  the  screws,  used  in  the  equipment  assembly,  to  make  sure  they  are  tight  and  correctly 
fixed. 
 

For  machines  installed  close  to  the  sea  or  in  difficult  conditions,  the  maintenance 
intervals shall be halved.

 

 
 

46.

0

 

CLEANING OF EXTERNAL PANELS

 

 
To clean the external panels of the machine use a wet cloth with water and soap. For difficult stains, use a 
mix  of  water  (50%)  and  denaturised  alcohol  or  specific  products.  On  completion  of  the  cleaning,  wipe 
carefully the surface. 
 

Do not use sponges with abrasive products or washing powder 

During the installation, the transparent film protecting the pre-painted metal sheet shall 
be removed.

 

 

 

50.

0

 

SMOKE EXTRACTOR CLEANING

 

 
Fan cleaning consists in the mechanical removal of the dust or of the possible foreign matters that may 
have been deposited on wheel, motor and casing.

 

 

 
 

51.

0

 

CLEANING OF SMOKE EXHAUST AND COMBURENT AIR SUCTION DUCTS

 

 
To clean the smoke exhaust and comburent air suction ducts, mechanically remove dust of any foreign 
matter deposited inside them.

 

 
 

52.

0

 

FUNCTIONING OF SAFETY DEVICES

 

 
Periodically check the operating condition of the safety devices in the equipment; simulate their functioning 
to ensure the equipment safety stop. 

 

 
 

53.

0

 

ATMOSPHERIC BURNER CLEANING

 

 
To clean the burner, pull it out of its housing and remove the possible scales that could have deposited on 
the tubular. Act only by means of compressed air or brass brush. If there are defective tubular or joints, 
they must be replaced.   

 

 

 
 


background image

 

11 

55.

0

 

IGNITION AND IONISATION ELECTRODES

 

 

 

For a proper ignition and operation of the appliance it is important to verify the exact position of ignition 
and ionisation electrodes. Particularly, make sure that the ignition discharge takes place at the level of the 
burner tubular slits at a distance of 3-4 mm.

 

 
 

51.

0

 

COMBUSTION ANALYSIS

 

 
Regularly carry out a combustion analysis, not least in compliance with the relevant regulations

 
 

57.

0

 

HEAT EXCHANGER CLEANING

 

 
The heat exchanger cleaning (inside and outside) is to be performed by skilled and qualified personnel and 
it is regulated by detailed Standards. In general, it is recommended to clean the exchanger at least once a 
year, at the beginning of winter.

 

 
 

58.

0

 

ASSISTANCE

 

 
To  have  information  about  the  nearest  authorised  Assistance  Centre,  please  contact  the  Seller  who  shall 
give you all the necessary information in this regard.

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

12 

59.

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

38057 PERGINE VALSUGANA (TRENTO) ITALY 

Viale dell’Industria, 19 

tel. (0461) 53 16 76  fax (0461) 51 24 32 

www.tecnoclimaspa.com 

tecnoclima@tecnoclimaspa.com 

 

 

Since our Company is constantly committed to improve its products, their esthetical features, size, technical data, fittings, and 

additional devices might change. 

05/13_Rev.0 

999/GB-MN