PDF User Manual

  1. Home
  2. Manuals
  3. Technogym MH650E Installation Manual

Technogym MH650E Installation Manual

Made by: Technogym
Type: Installation Manual
Category: Fitness Equipment
Pages: 12
Size: 5.20 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

10/11/2011 

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

 

 

 

 

 
 
 

 

 

MACHINE INSTALLATION MANUAL 

 

KINESIS STATIONS CORE 

MH650E 

 

 

EQUIPMENT NECESSARY FOR THE INSTALLATION 

 

 

 

 

 

 
 
 

 

N.B. 

 

Wrenches T 5-6-8 
socket wrench/open end wrench 17  
knives 
Electric Phillips-head screwdriver and/or Phillips 
screwdriver carrier and/or dollies 

 

 

Bolts and nuts are contained in a special blister pack with relative legend 
The housings are extremely delicate (once unpacked they become 
dirty very easily) 
The weight of the machine is top-heavy towards the seat 

To fix the machine to the ground, position the plates before closing the housings 

 
 
 
 
 
 
 
 
 
 
 
 
 

PEOPLE NECESSARY FOR THE INSTALLATION 

 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

 

 

 

 
 
 
 
 

General Information 

 

 

HARDWARE COMPONENTS 

 

Code

 

Description

 

Quan
tity

 

Letter blister-code

 

Description

 

Quantit
y

 

H0007114AC

 

Seat unit

 

1

 

0Z126

 

Screw M10x35  8,8 Z

 

2

 

0Z306

 

washer 10.5x20x2 Z

 

8

 

 

 

T0000252AC

 

 

 

foot unit

 

 

 

1

 

0Z023AA

 

Screw 10X65  8.8 Z

 

2

 

0Z306

 

washer 5x20x2 Z

 

3

 

0Z126

 

Screw M10x35  8.8 Z

 

1

 

0Z415

 

self-locking nut M10 
Z

 

2

 

0D004515AC

 

frame unit 

(housing 

 

1

 

0Z165

 

M5x10 8.8 Z

 

2

 

 

0C002209AC

 

 

rear housing

 

 

2

 

0Z216

 

Screw M6x35  10.9 Z

 

1
0

 

0B001935

 

washer

 

1

 

0G001314

 

well nut M6

 

1

 

 

H0007216AA

 

 

handles unit

 

 

2

 

0N001388AA

 

handle

 

2

 

0N001389AB

 

plate

 

2

 

0Z208

 

Screw M8x16  10.9 Z

 

4

 

 

0N001523AB

 

plates for fastening to 

the ground

 

 

2

 

0Z438 (no blister)

 

lower nut M12

 

1

 

0Z313 (no blister)

 

washer 13x24x2,5

 

3

 

0Z183 (no blister)

 

Screw M12x70  8.8 Z

 

1

 

 

 

Time (minutes) installation standard conditions 

 

Code

 

Tot persons

 

T installation

 

T handling

 

T fixing

 

CNC

 

2

 

30

 

5

 

5

 

 

Machine technical 

data 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

 

 

 

 

 

UNPACKING MACHINE 

 

 

 

 

DO NOT USE KNIFE

 

 

UNPACKING MACHINE SEQUENCE 

 

Phase 1

 

 

Operator A 

Operator B

 

 

Remove cardboard packaging box 

 

 

 

 

 
 

 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

Phase 2

 

 

 

 

 

Operator A 

Operator B

 

 

 
 
 

Disassemble the right-left wooden frame 

(dotted black line) 

Remove 2+2 screws fixing right-left of wood 

(detail) 

Take out and place the machine parts next to the 

unpacking area 

 

 
 
 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

Phase 3

 

Operator A

 

Operator B

 

 

 

 

 

 

 

 

Cut the lower blackties (do not cut the 4 upper ones), position the transport carrier,  separate 

the wooden frame from the pallet and transport the machine to an area close to the unpacking 

 
 
 
 
 
 
 
 
 
 
 

 

N O

 

 

 
 
 
 
 
 

 

 
 
 
 
 

 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

Phase 4

 

Operator A

 

Operator B

 

 

 

 

Eliminate the wooden frame "A", eliminate the polyethylene bag 

 

 
 

 

 

 
 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

 

 

 

 

 

Transport the machine +components to the assembly area using the transport trolley or dollies 

depending on the type of area  

 

 

         

 

MACHINE ASSEMBLY SEQUENCE 

 

Phase 1

 

 

Operator A-B

 

 

 

Tighten seat unit to frame with 2+2 screws and 2+2 washers, eliminating the support clamp 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

 

 

 

 
 
 
 
 
 

Phase 2 

 

 

Operator A 

Operator B

 

 

 

Insert rear foot to frame unit, tightening the 2 screws 

K + 1 screw J + 2+2 washers + nut 

 

 

 

 
 
 

 

tighten all the arms (the screws have already been 

preset by Operator B) 

unhook 3 arms D, remove plate F, install  the arms in the 

special housings inserting 2 screws G + 2 washers for 

each arm 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10/11/2011 

Phase 3

 

 

 

 

 

Operator A 

Operator B

 

 

Remove the packaging of central frame unit L, 

slide down the frame in the open slot, tighten 

with 2 screws M 

 

Insert 10 threaded pins (well nut) into the 

frame unit 

 

 
 
 

                                                                                                 

 

 
 

 

 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

10 

10/11/2011 

Phase 4

 

 

 

 

 

 

 

Operator A 

Operator B

 

 

Remove the packaging, take out the right housing 

and insert into the frame unit starting from the top 

and continuing to the bottom, tighten with 5 

screws P + 5 washers, insert right handle Q and 

tighten with 2 screws R 

 

 Remove the packaging, take out the left housing and 

insert into the frame unit starting from the top and 

continuing to the bottom, tighten with 5 screws P + 5 

washers, insert right handle Q and tighten with 2 

screws R 

 

 

                                              

 

 

 
 
 

 

 
 

 

 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

11 

10/11/2011 

Phase 5

 

 

 

 

 

Operator A 

Operator B

 

 

 

 

Test machine 
Clean assembly area 

Deliver documentation and explanation 
on use of the machine to the customer 

 

 
 
 
 

WARNING 

 
 
 
 

 

If it is  necessary to move the 
machine once the installation 
is completed, pay attention to 
the housing of the front and 
back feet (shown in the 
illustration). Lift up the foot 
and remove the feet if needed 

 

 
 
 
 
 
 
 
 
 
 
 

When transporting the 
machine (especially up stairs) 
place a wooden beam (take it 
from the packaging) between 
the rods shown in the figure 
and the transport trolley, 
to avoid bending the rods 

 


background image

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

12 

10/11/2011 

 

 

 

 

 
 
 
 

TO FIX THE  MACHINE TO THE GROUND 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

To FIX the equipment to the ground, proceed in the same way on both sides of the equipment: 
fasten clamps M with screws C with nuts and washers (bolts and nuts are preassembled on the 
frame). 

 

Mark on the floor the point where to drill the two holes. Drill the floor. Insert the anchoring 
bolts into the holes of clamps M. 

 

ATTENTION: use an anchor bolt with minimum guaranteed weight 50kg