PDF User Manual

  1. Home
  2. Manuals
  3. TED pro home Installation Manual

TED pro home Installation Manual

pro lite\ home\ Pro Home

Made by: TED
Type: Installation Manual
Category: Measuring Instruments
Pages: 16
Size: 0.58 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

I n s ta l l at i o n

M a n u a l 

f o r

T E D   P r o   H o m e

T E D   P r o   L i t e

A  B  C

Rev 3.9

 


background image

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

TA B L E   O F   C O N T E N T S

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2

Quick Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Page 3

Operating Conditions  . . . . . . . . . . . . . . . . . . . . . . .  Page 4

Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Page 4

System Components . . . . . . . . . . . . . . . . . . . . . . . .  Page 5

Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Page 6

Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Page 7

Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Page 11

Footprints Software Installation . . . . . . . . . . . . . . .  Page 12

Appendix A - Wind/Solar Installation . . . . . . . . .  Page 14

PART

 

I

PART II

PART III

PART IV

PART V

Appendix

IMPORTANT:

The installation of your TED Pro Home system is a several-step 

process.  The 1st step is the installation of the MTU Home.   After 

the MTU Home is installed, Step 2 is the installation of the ECC, 

and the last Step ... Footprints software.

If  the  equipment  is  used  in  a  manner  not 

specified by the manufacturer, the protection 

provided by the equipment may be impaired.

G   L   O   S   S   A   R   Y     o f     T   E   D       T   E   R   M   S

      Please see the following link for TED Terms and Glossary:

     http://www.theenergydetective.com/downloads/TEDterms.pdf

 


background image

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 3

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

Quick Start

IMPORTANT:  Quick Start instructions are a summary of the main aspects of 

MTU installation, and not to be considered a replacement for the complete 

Installation Instructions contained in this Manual.

CTs (Current Transformers) Direction:

Clip  CTs  around  the  conductor  for  each  phase,  with  RED  polarity  dot  facing 

the  utility.    Loads  should  be  displayed  as  a  positive  number  on  Footprint’s 

Data Communication - PLC 

The method of communication is PLC (Power Line Carrier).  If possible, 

plug ECC into a Phase A outlet.  After the ECC has been configured with 

MTU ID, the PLC Link LEDs should turn solid green within 3-5 minutes.  

It is very important that the Installer 

verify operation before leaving the 

site  by  checking  LINK  LEDs  and 

verifying  reading  on  Footprints 

Dashboard.  

(See Page 11 for more diagnostics)

MTU Link LED

ECC Link LED

Accessing TED FOOTPRINTS

Plug the Ethernet cable from the ECC into the router or network drop and find 

the ECC IP address on your network, using one of the following methods:

From your computer desktop:

 Go to 

http://www.theenergydetective.com/downloads-documents 

Download and Run the Installation Utility (The same network utility is used on 

TED5000  and TEDPro  products).   This  utility  will  scan  your  network.  Select 

TED6000 when it appears and click LAUNCH IN BROWSER.

-or-

From your smart phone:

  (Connected to the WIFI of the same network as the 

ECC) Download and RUN a free third party network-scanning tool like “

FING

” 

For MTU power cable connection

, reference drawing on Page 8

.

Dashboard.    Solar  production  should  be 

displayed as a negative value on the Foot-

print’s Dashboard.  I

f polarity is incorrect 

on the Dashboard, swap A & B CT-inputs 

on the MTU (shown here)

.

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 4

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Use

Condition

Temperature

Relative Humidity

Altitude

Voltage

 Maximum Power

Indoor

Dry

+10° +40°C

< 80%

 3,300M

95-277 VAC

5W

Indoor/Outdoor

 Dry /Damp

- 40°C to +50C

< 95%

3,300M

200-500 VAC

1.5W

Impact Energy Level IK07

Display & 

ECC

MTU & CTs

SAFE OPERATING RANGE AND CONDITIONS:

Limitations

Please note the following limitations:

•  MTU Home and MTU Pro Lite are suitable for use on 50 or 60 Hz services around the world 

up to 277V phase-to-neutral.

•  MTU Home and MTU Pro Lite utilize Power Line Communication (PLC) to transmit Energy 

data to the ECC. If you require Ethernet communication for your application, please see 

specifications for TED Pro MTU at www.theenergydetective.com

•  MTU Home and MTU Pro Lite are suitable for use with solar/wind generation systems. You 

will need to purchase one additional MTU Home. When installed it will tell you Load, Gen-

eration and NET metering.

•  MTU Home and MTU Pro Lite are suitable for use on single-phase services up to 400A.

o  For services >200A optional accessories are required. See website for details.

o  Accuracy when used on single-phase services is better than ±2%

•  MTU Home is suitable for use on single-phase services derived from 3-phase (i.e. apart-

ments at 208/120V) up to 200A.

•  MTU Pro LITE is suitable for use on 3-phase wye configuration services up to 200A. (MTU 

Home is not suitable for 3 phase services.)

o  Accuracy when used on 3-phase services is better than ±5%.

o  For 3-phase services you will need to purchase one additional CT.

o  For other 3 phase configurations or higher amperage services, see specifications for 

TED Pro MTU at www.theenergydetective.com

    PA R T   I   –   I N T R O D U C T I O N

from your App store.   The ECC will be labeled “Energy” on the list of connected 

devices.  Enter the IP address for ECC into the address bar of a Browser.

Note:

 For details on Footprints settings, download the ECC User’s Manual 

from the TED website.  

http://www.theenergydetective.com/downloads/ECCUsermanual.pdf

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 5

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

SYSTEM COMPONENTS

Unpacking

Unpack TED and ensure that all parts are included in the package.

A)

  One (1) Measuring Transmitting Unit (MTU Home)

D)

  MTU  Home  will  have  two  (2)  Model  CT601B  Current 

Transformers (CT’s), MTU Pro LITE will have three (3) 
Model CT601B Current Transformers (CT’s)

B)  

One (1) ECC (Energy Control Center).

C) 

 Power Cables for MTU Home and, ECC; Ethernet Cable.

G) 

 Installation Manual - Please Read Carefully

If you received the optional Wireless Display, let’s get the battery charging:

-  Plug the power adapter into a wall outlet

-  Connect the power cable to the charging stand.

-  

Remove battery tab.

-  Install Display into charging stand.

E) (Optional) Wired Display and Flat, USB3 Type Data Cable

F) (Optional) Wireless Display, Stand, Power Adapter, and USNAP Zigbee 

Wireless Card seated firmly in bottom of ECC.

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 6

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

PA R T   I I   –   S A F E T Y

The Installation of TED is intended for professional electricians 

or highly technical home owners only.

This brief manual summarizes the steps necessary to safely install the MTU and Current 

Transformers (CTs).  For detailed installation and operation of other components and software, 

please refer to the HELP Section of the TED Footprints Software, or see Support at:
                                                              www.theenergydetective.com

Every effort has been made in providing for the safe, secure installation of TED.  The installation of 
TED requires the cover of the main electrical circuit breaker panel to be removed.  After the circuit 
breaker panel cover has been removed, the potential hazard of shock, burn, or even electrocution 
now exists.  Do not attempt to complete this installation unless you are a licensed electrician familiar 
with the electrical components and operation of the circuit breaker panel.   Even when the main circuit 
breaker has been turned to the “OFF” position, certain areas within the circuit breaker panel may still 
be electrified.  Do not attempt installation unless you know where these electrified areas are.

This symbol will be found throughout 
the  instructions  where  there  is  a  po-
tential for electric shock, burn, or even 
electrocution. Do not attempt to com-
plete the noted section if you are not 
an electrician, or qualified installer

.

WARNING 

- These servicing instructions are for use by qualified personnel only.  To reduce the risk of 

electric shock, DO NOT perform any servicing other than that contained in these operational instructions 
unless you are qualified to do so.

WARNING 

- The MTU must be connected to a switch or circuit breaker in close proximity to the equipment 

and within easy reach of the operator.  It must be marked as the disconnecting device for the MTU.

WARNING

 - If the equipment is used in a manner not specified in these instructions, the protection 

provided by the equipment may be impaired.

WARNING

 – The MTU must be installed within the electrical panel to ensure protection against possibility 

of physical damage to the enclosure due to impact from falling objects.

TESTED TO COMPLY WITH 

FCC STANDARDS

FOR  HOME  AND  OFFICE  USE 

Energy, Inc. Model TED6000 / TED Pro

                                                   Home

This device complies with part 15 of the FCC Rules.  

Operation is subject to the following  two conditions:    

(1) This  device  may  not  cause  harmful  interference, 

and   (2) This device must accept any interference received, 

including interference that may cause undesired operations. 

 

FCC Part 15 SubPart B

EU/EN 61326-1

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 7

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

B E F O R E   Y O U   S TA R T

•  Do not begin installation until you have read the “Safety” section of this manual.
•  Read all instructions before beginning installation.

Estimated Installation Time:
Professional Installer: 15 minutes

Equipment Needed:
-  Flathead screwdriver - small and large
-  Phillips screwdriver - small and large
-  Flashlight

Important Notes:

-  For services with Wind/Solar or Standby Generator, an additional MTU will be required to measure 

GENERATION and NET.

-  All wiring in the United States must be installed in accordance with the latest adopted edition of the 

National Electrical Code (ANSI/NFPA 70, NEC) and state or local requirements.  

-  All wiring in Canada must be installed in accordance with the latest adopted edition of the Canadian 

Electrical Code (CSA C22.2 CEC, Part I) and any provincial or local requirements.

-  Wiring in other countries and jurisdictions should be done in accordance with the rules and regulations in 

effect for the installing location. Contact your local power authority or local regulator for more information.

-  Turn off all power to the circuit breaker panel by turning off the main breaker or main switch.

Definitions:
-  MTU – Measuring Transmitting Unit
-  ECC – Energy Control Center
-  DISP – LCD Display

PA R T   I I I   –   I N S TA L L AT I O N

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 8

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

I n s t a l l a t i o n   Procedure

STEP 1

 

– 

Installing the MTU Power Cable

NOTE:  Do not connect the Power Cable to the MTU until you have the CTs connected.  The 

MTU must sense the CT connections on power up.

A)  See NOTE above.  Turn off power.
B)  Remove circuit breaker panel cover.

C)  

Record the Serial Number of the MTU

 as shown on the label. It consists of six digits in 

the form “12 34 56.”  You will need to know this number to connect the MTU to the ECC 

Network.

D)  Connect the black wire from the MTU power cord to a spare 15, 20 or 30 Amp single 

pole circuit breaker in the panel.

Red polarity dots

 facing Utility

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 9

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

 

E)  If there is no spare circuit breaker, the black wires can be attached to any 15, 20 or 30 Amp 

single pole circuit breaker in the panel, provided that the circuit breaker is approved for 

2 conductors and this is acceptable to the “authority having jurisdiction in the installation 

location” (it is generally acceptable);

NOTE: For optimal PLC Communication, the ECC must be plugged into a circuit on 

the same phase as the black wire on the MTU power cable.  (If your readings 

display as negative, swap A & B CT-inputs on MTU.)

F)  Connect the white wire from the MTU to the neutral bus on the panel.
G)  Do not connect the Power Cable to the MTU until you have the CTs connected.

STEP 2

 

Installing and Connecting the Current Transformers (CTS)

A)  CAUTION – IF THIS IS A COMBINATION PANEL, THE LUGS ON THE PRIMARY SIDE OF 

THE MAIN  BREAKER ARE PROBABLY STILL HOT.  

B)  Determine what type of system you have. 

     i.  Split single-phase 3-wire. Common in North America residential and

         small commercial buildings. There will be 2 power wires (usually black 

         and red) and one neutral wire (usually white). Voltage from the power wires 

         to neutral will be approximately 120V,  Voltage from one power wire to the 

         other will be double that, approximately 240V.

    

Install 2-CTs, one over each of the power wires and plug into A & B ports on the MTU.

ii. Single-phase 2-wire. Common in Europe and many other countries. There will be one 

power wire (usually black or brown) and one neutral wire (usually white or blue).  

         Install one CT over the power wire and plug into A port on the MTU.

iii.  Single-phase derived from 2 phases of a 3-phase system. (Sometimes called 2-phase).  

Typical in apartment or office buildings, common in many countries. Same as 3-phase   

except only 2 of the 3 phases are brought into the building or panel.  

      

Install 2-CTs, one over each of the power wires and plug into A & C ports on the MTU.

iv.  3 Phase Wye (MTU Pro LITE only)

      Install 3-CTs, one over each of the power wires and plug into A, B, & C ports on the MTU.

Note 1: 

The CTs should be installed on the secondary side of the main switch or main circuit  

breaker, however, if this is not possible, such as in the case of a combination breaker 

panel, then install on the primary side of the main breaker.

Note 2: 

 The CTs must be installed with the RED polarity dot facing the utility. (Facing away from 

the breaker if measuring main service; Toward the breaker if measuring generation or a 

single load.) 

Note 3:  

Do not install the CT over the neutral (N) (grounded) conductor.

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 10

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Note 4: 

If you have solar, wind or standby generator, you will need an additional MTU if you 

want to measure: Generation, Load and Net Utility. Please see solar/wind section of 

our website for details.

Note 5:  

To install the CT:

•  Open the CT by lifting the locking tab on the side of the CT, over the restraining clip. 

•  Place the CT over the cable and close the locking tab. 

•  Insure that it is properly seated and the CT will not open with a gentle pull.

  (The CT will likely be loose around the wire - this is fine) 

STEP 3 

- Installing the MTU

A)  Plug the power cord into the MTU

B)  Determine the best location to mount the MTU.

i.  Choose a location where it will not interfere with existing equipment or wiring.

ii.  The MTU may be attached using double-sided tape (if allowed in your jurisdiction), 

or with sheet metal or machine screws.

C)  Arrange and tie-wrap all wiring in a neat and tidy manner.

D) Turn on the power.

NOTE:  

If you have a solar installation, see Appendix A.

LEDs will begin to blink on the MTU

Do not close the electrical panel until you have completed the installation of the 

ECC and verified that correct data is being received from the MTU.

Close the Electrical Panel only after you have confirmed the correct operation of the TED 

Pro system.

STEP 4

 - Accessing TED FOOTPRINTS

Plug the Ethernet cable from the ECC into the router or network drop and find the ECC IP ad-

dress on your network, using one of the following methods:

From your computer desktop:

 Go to 

http://www.theenergydetective.com/downloads-documents 

Download and Run the 

Installation Utility

 (The same network utility is used on TED5000 and 

TEDPro products).  This utility will scan your network. Select TED6000 when it appears and click 

LAUNCH IN BROWSER.

-or-

From your smart phone:

  (Connected to the WIFI of the same network as the ECC) Down-

load and RUN a free third party network-scanning tool like “

FING

” from your App store.   The 

ECC will be labeled “Energy” on the list of connected devices.  Enter the IP address for ECC 

into the address bar of a Browser.

  

Note:

 For details on Footprints settings, download the ECC User’s Manual from the TED 

website.  
http://www.theenergydetective.com/downloads/ECCUsermanual.pdf

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 11

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

PA R T   I V   –   T E S T I N G   T H E   S Y S T E M

NOTE TO PROFESSIONAL INSTALLER:

Even if the customer chooses to configure the ECC, display and network, it is extremely 

important that the installing electrician verify correct operation and measurement prior 

to leaving the site. This can be done with an optional Display or using a laptop computer 

and Footprints software.

    MTU and ECC are paired at the factory and will begin to communicate on power-up. If not 

you may need to input the MTU ID in System Setup.  Refer to website for ECC operation 

manual.

1. 

ECC

-  To achieve optimum communication between the ECC and MTU, Insure that the MTU 

and  ECC  are  connected  to  the  same  phase.  Plug  ECC  into  suitable  outlet.  Do  not 

choose an outlet that has a lot of electronic or computer equipment plugged into the 

same outlet.  Do not plug the ECC into a circuit with a UPS battery backup.

2. 

DISPLAY (optional equipment)

.

a.  Wireless Display

•  Plug  power  supply  into  suitable  outlet.  Connect  power  supply  outlet  to  back  of 

charging stand. 

•  Remove battery protection tab from Display.

•  Plug Display into charging stand.

b.  Wired Display  (Refer to Appendix C of ECC User Manual)

•  Remove power from ECC

•  Plug Display cable into rear of Display

•  Plug other end of cable into Display port at rear of ECC

•  After connecting Display, insert AC cord into wall outlet to power on the ECC.

3. Check operation of Power Line Communication (PLC) Status LEDs.

MTU

 – There are two LEDs on the front of MTU

o  Bottom LED – Link 

-  Will blink on power-up.

-  Will turn solid green when linked to ECC – Single-phase

-  Will turn solid red when linked to ECC – Three-phase/Two-phase

o   Top LED – Send/Receive

-  Blinks green when receives data from ECC

-  Blinks red when transmits date to ECC

-  In normal operation it will be constantly flashing red and green.

ECC 

– There are two LEDs on the left side of the ECC

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 12

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

o  Rear LED – Link 

-  Will blink on power-up.

-  Will turn solid red when network established

-  Will turn solid green when ECC is linked and receiving data from at least one 

MTU

o  Front LED – Send/Receive

-  Blinks green when receives data from MTU

-  Blinks red when transmits date to MTU

-  In normal operation it will be constantly flashing red and green

TEST USING DISPLAY

Once installed, you should see values for kW demand and $ per/hour on the screen (default 

energy rate is $0.10 per kWh).

-  Turn on a known load (example 1200w microwave, Display should increase by 1.2kW)

-  Turn on a known 240V load (example an electric oven: Display should increase by a 

few kW. If it goes down, or only goes up by a few watts, then you have one of the CTs 

reversed. Make sure that the red dots are all facing towards the power source). 

TEST USING FOOTPRINTS SOFTWARE
NOTE:

 Once the Footprints Dashboard is accessed via one of the methods below, the 

User should review the additional documentation and information under the “HELP” 

button, or download the User’s Manual here:

 

   

 http://www.theenergydetective.com/prodocs

Direct PC Connection:

 For further detailed assistance visit: 

   

 

(www.theenergydetective.com/tedprocomputer)

-  Connect ECC to installer laptop with Ethernet cable. 

-  Insure that IP address of Ethernet adapter is set at 192.168.7.1 (refer to Appendix A of 

User’s Manual for network support)

-  In your web browser type “

192.168.7.4

” in the address bar.

-  Should load footprints software and show power readings on the speedometer of the 

dashboard.

-  If not, verify PLC Status LEDs and MTU ID in System Settings.  Disconnect / reconnect 

MTU from MTU Power Cable.

-  Repeat load tests shown above.

Connection via customer’s router 

(if you are owner or have access to customer’s network) 

See 

STEP 5 - 

Accessing TED FOOTPRINTS on Page 10

.

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 13

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

   Footprints software should have launched at this point.

  Footprints software should be displaying power readings on the speedometer of the 

Dashboard.

-  If not, Verify PLC status LEDs and MTU ID in System Settings.  Disconnect / reconnect 

MTU from MTU Power Cable.

-  If the loads on Dashboard are negative (and there is no Solar generation) switch the 

A & B CT-inputs on the MTU.

-  Repeat load tests shown above.

-  If you are having issues, see:

theenergydetective.com/tedprorouter  for further

assistance.

O n c e  S e t u p  i s  c o m p l e t e ,  i t  i s  r e c o m m e n d e d 

t o  g o  t o  F o o t p r i n t s  -  A D VA N C E D  a n d  s e l e c t 

“ R e s e t   To t a l s   t o   Z e r o . ”     T h i s   w i l l   i n i t i a t e 

t h e   l o g g i n g   o f   H i s t o r y.

W h e n   f u t u r e   c o n f i g u r a t i o n   c h a n g e s   a r e 

m a d e ,   v e r i f y   h i s t o r y   i s   b e i n g   r e c o r d e d 

b y   v i e w i n g   t h e   m i n u t e   g r a p h .     I f   r e a l 

t i m e   r e a d i n g s   a r e   b e i n g   r e p o r t e d ,   b u t 

h i s t o r y  i s  n o t  r e c o r d e d  i n  m i n u t e  g r a p h , 

g o  t o  F o o t p r i n t s  -  A D VA N C E D  a n d  s e l e c t 

“ R e s e t   To t a l s   t o   Z e r o . ”

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

Page 14

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Appendix A

Solar, Wind or Auxiliary Generator  Installation Addendum

Installing the Solar/Wind, or Auxiliary Generator components (“Solar” for short) needs to be 

completed after the installation instructions have been followed for the installation of MTU 1 

(beginning on page 6 of this Instruction Guide).

 

 

Assuming that you have successfully installed MTU 1 as detailed above, it is time to connect 

MTU 2 to your Solar system.  While there are many different variations in Solar connections, 

we are presenting the installation of MTU 2 in the most common scenario.

Solar  panels  connect  to  an  inverter  which  changes  DC  to AC.    In  most  cases  it  will  be 

120/240V. The connection can tie into the main switch/Circuit Breaker, a transfer switch, a 

junction box, a splitter box, etc.  It really doesn’t make any difference. 

In the case of an auxiliary generator, it will likely tie into a transfer switch because generally 

speaking, a generator is not run in parallel with the utility.  

You will use both CTs if your inverter connects via 240v...otherwise, if it is 120V, you will only 

use one CT.

The MTU/CTs are connected similarly as connecting MTU 1.  (See image on Page 8).  If 

possible, both MTUs should be powered from the panel on the same circuit or phase as the 

ECC. This will give the cleanest Power Line Carrier signal.  (Try NOT to power the MTU from 

the inverter, as there will be a lot of line noise that could interfere with the signal).

Generation should display as a negative number.  Verify RED dots on CTs 

are facing the Utility (or toward the panel if feeding back through the panel to 

Grid).  If Generation is showing as a positive number, switch the A & B inputs 

on the MTU.

 


background image

        © Copyright 2001 - 2017      Energy, Inc.       All rights reserved                                              www.theenergydetective.com

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Page 15

     * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Rev 3.9

Please see the following link for TED Terms and Glossary:

http://www.theenergydetective.com/downloads/TEDterms.pdf 

N O T E S

 


background image

648 Marina Drive

Charleston, South Carolina 29492

(843) 766-9800

(800) 959-5833

www.theenergydetective.com