PDF User Manual

  1. Home
  2. Manuals
  3. Heat-N-Glo ST-38GTV Installer's Manual

Heat-N-Glo ST-38GTV Installer's Manual

Made by: Heat-N-Glo
Type: Installer's Guide
Category: Indoor Fireplace
Pages: 16
Size: 0.24 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

1

- Do not store or  use gasoline or other flam-

mable vapors and liquids in the vicinity of this

or any other appliance.

-

What to do if you smell gas

• Do not try to light any appliance.
• Do not touch any electrical switch.
• Do not use any phone in your building.
• Immediately call your gas supplier from a

neighbor's phone. Follow the gas supplier's

instructions.

• If you cannot reach your gas supplier, call

the fire department.

- Installation and service must be performed by a

qualified installer, service agency, or the gas

supplier.

Model:

ST-38GTV

Installers Guide

WARNING:  IMPROPER  INSTALLA-

TION, ADJUSTMENT, ALTERATION,

SERVICE  OR  MAINTENANCE  CAN

CAUSE INJURY OR PROPERTY DAM-

AGE. REFER TO THIS MANUAL. FOR

ASSISTANCE OR ADDITIONAL INFOR-

MATION  CONSULT A  QUALIFIED  IN-

STALLER, SERVICE AGENCY, OR THE

GAS SUPPLIER.

456-980B  3/01

READ THIS MANUAL BEFORE INSTALLING OR

OPERATING THIS APPLIANCE. THIS 

INSTALLERS

GUIDE 

MUST BE LEFT WITH APPLIANCE FOR

FUTURE REFERENCE.

Please contact your Heat-N-Glo dealer with any

questions  or  concerns.  For  the  number  of  your

nearest Heat-N-Glo dealer, please call 952-985-6000.

Printed in U.S.A.   Copyright 2001,
Heat-N-Glo, a division of Hearth Technologies Inc.

20802 Kensington Boulevard, Lakeville, MN 55044

WARNING: IF THE INFORMATION

IN THESE INSTRUCTIONS IS NOT

FOLLOWED EXACTLY, A FIRE OR

EXPLOSION MAY RESULT CAUS-

ING PROPERTY DAMAGE, PER-

SONAL INJURY, OR DEATH.

This  product  is  covered  by  one  or  more  of  the  following  patents:  (United  States)  4,112,913;  4,408,594;  4,422,426;  4,424,792;  4,520,791;  4,793,322;

4,852,548;  4,875,464;  5,000,162;  5,016,609;  5,076,254  5,191,877;  5,218,953;  5,328,356;  5,429,495;  5,452,708;  5,542,407;  5,613,487;  (Australia)

543790;  586383;  (Canada)  1,123,296;  1,297,746;  2,195,264;  (Mexico)  97-0457;  (New  Zealand)  200265;  or  other  U.S.  and  foreign  patents  pending.

 


background image

2

These units 

MUST 

use one of the vent systems

described in the Installing the Fireplace section of

the 

Installers Guide

NO OTHER 

vent systems or

components 

MAY BE USED

.

This gas fireplace and vent assembly 

MUST 

be

vented directly to the outside and 

MUST NEVER 

be

attached to a chimney serving a separate solid fuel

burning appliance. Each gas appliance 

MUST USE

a separate vent system. Common vent systems are

PROHIBITED

.

INSPECT 

the external vent cap on a regular basis to

make sure that no debris is interfering with the air

flow.

The glass door assembly 

MUST 

be in place and

sealed, and the trim door assembly 

MUST 

be in

place on the fireplace before the unit can be placed

into safe operation.

DO NOT OPERATE 

this appliance with the glass

door removed, cracked, or broken. Replacement of

the glass door should be performed by a licensed

or qualified service person. 

DO NOT 

strike or slam

the glass door.

The glass door assembly 

SHALL ONLY 

be

replaced as a complete unit, as supplied by the gas

fireplace manufacturer. 

NO SUBSTITUTE 

material

may be used.

DO NOT USE 

abrasive cleaners on the glass door

assembly. 

DO NOT ATTEMPT 

to clean the glass

door when it is hot.

Turn off the gas before servicing this appliance. It is

recommended  that  a  qualified  service  technician

perform an appliance check-up at the beginning of

each  heating  season.

Any safety screen or guard removed for servicing

must be replaced before operating this appliance.

DO NOT 

place furniture or any other combustible

household objects within 36 inches of the fireplace

front.

READ 

and 

UNDERSTAND 

all instructions carefully

before starting the installation. 

FAILURE TO

FOLLOW 

these installation instructions may result

in a possible fire hazard and will void the warranty.

Prior to the first firing of the fireplace, 

READ 

the

Using Your Fireplace section of the 

Owners Guide

.

DO NOT USE 

this appliance if any part has been

under water. Immediately 

CALL 

a qualified service

technician to inspect the unit and to replace any part

of the control system and any gas control which has

been under water.

THIS UNIT IS NOT FOR USE WITH SOLID FUEL.

Installation and repair should be 

PERFORMED 

by a

qualified service person. The appliance and venting

system should be 

INSPECTED 

before initial use

and at least annually by a professional service

person. More frequent cleaning may be required

due to excessive lint from carpeting, bedding

material, etc. It is 

IMPERATIVE 

that the unit’s

control compartment, burners, and circulating air

passageways 

BE KEPT CLEAN 

to provide for

adequate combustion and ventilation air.

Always 

KEEP 

the appliance clear and free from

combustible  materials,  gasoline,  and  other

flammable  vapors  and  liquids.

NEVER OBSTRUCT 

the flow of combustion and

ventilation air. Keep the front of the appliance

CLEAR 

of all obstacles and materials for servicing

and  proper  operations.

Due to the high temperature, the appliance should

be 

LOCATED 

out of traffic areas and away from

furniture  and  draperies.  Clothing  or  flammable

material 

SHOULD NOT BE PLACED 

on or near the

appliance.

Children and adults should be 

ALERTED 

to the

hazards of high surface temperature and should

STAY AWAY 

to avoid burns or clothing ignition.

Young children should be 

CAREFULLY SUPERVISED

when they are in the same room as the appliance.

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

SAFETY AND WARNING INFORMATION

!

!

 


background image

3

Safety and Warning Information ..................................... 2

Service Parts List ............................................................4

Section 1: Approvals and Codes ....................................6

Appliance Certification........................................................ 6
Installation Codes ...............................................................6
High Altitude Installations ....................................................6

Section 2: Getting Started ..............................................7

Introducing the Heat-N-Glo Gas Fireplaces .......................7
Pre-installation Preparation ................................................7

Section 3: Installing the Fireplace .................................9

Step 1 Locating the Fireplace .........................................9
Step 2 Framing the Fireplace .........................................9
Step 3 Negative Pressure Make-up Air ......................... 10
Step 4 Installing the Vent System ................................. 11

A. Vent System Approvals ................................. 11
B. System Components .................................... 11

C. Bedroom Installation in Canada ....................... 12

D. Vent Termination ........................................... 12

Step 5Positioning, Leveling, and

Securing the Fireplace ...................................... 12

Step 6 The Gas Controls System................................. 13
Step 7 The Gas Supply Line ......................................... 13
Step 8 Gas Pressure Requirements ............................ 14
Step 9 Wiring the Fireplace .......................................... 14
Step 10 Finishing ............................................................ 16
Step 11 Installing Trim, Logs, and Ember Material ......... 16

Installing the Trim .............................................. 16
Positioning the Logs .......................................... 16
Placing the Ember Material ............................... 16

Step 12 Before Lighting the Fireplace ............................. 17
Step 13 Lighting the Fireplace ........................................ 17
After the Installation .......................................................... 17

Section 4: Maintaining and Servicing

Your  Fireplace ............................................. 18

Table of Contents

u

 = Contains updated information.

u

u

u

u

u

u

u

u

u

 


background image

6

Appliance Certification

The Heat-N-Glo fireplace model discussed in this 

Installers

Guide

 has been tested to certification standards and listed

by the applicable laboratories.

Certification

MODEL:

    ST-38GTV

LABORATORY:   

 Warnock Hersey Listed

TYPE:    

“B”  Vent Decorative

STANDARD: 

   ANSI Z21.50•CGA2.22

Installation Codes

The fireplace installation must conform to local codes. Before

installing  the  fireplace,  consult  the  local  building  code

agency  to  ensure  that  you  are  in  compliance  with  all

applicable codes, including permits and inspections.

In the absence of local codes, the fireplace installation must

conform to the  National Fuel Gas Code ANSI Z223.1 (in

the United States) or the CAN/CGA-B149 Installation Codes

(in Canada). The appliance must be electrically grounded

in accordance with local codes or, in the absence of local

codes with the National Electric Code ANSI/NFPA No. 70

(in the United States), or to the  CSA C22.1 Canadian Electric

Code (in Canada).

This model (natural gas and propane) can be installed in a

bedroom (in the United States) which has a total volume of

unconfined space appropriate to the particular installation.

Refer to the National Fuel Gas Code ANSI Z223.1/NFPA54

(current edition).  The Uniform Mechanical Code - (current

edition), and local Building Officials for the options allowed

in obtaining an effective bedroom volume of unconfined

space.
This model (natural gas and propane) can be installed in a

bedroom (in Canada) if a thermostat (Model WH-STAT) is

installed  with  the  unit.  Consult  local  code  authorities.

Detailed installation instructions for Model WH-STAT are

included with the kit.

1

Approvals and Codes

High Altitude Installations

Warnock  Hersey  Listed  gas  fireplaces  are  tested  and

approved for elevations from 0 to 2,000 feet in the U.S.A.

and from 0 to 4,500 feet in Canada.

When installing this fireplace at an elevation above 2,000

feet (in the United States), it may be necessary to decrease

the input rating by changing the existing burner orifice to a

smaller size. Input should be reduced four percent (4%) for

each 1,000 feet above sea level, unless the heating value of

the gas has been reduced, in which case this general rule

will not apply.

When installing this fireplace at an elevation between 2,000

and 4,500 feet (in Canada), the input rating must be reduced

by ten percent (10%).

When installing this fireplace at an elevation above 4,500

feet (in Canada), check with local authorities.

Consult your local gas utility for assistance in determining

the proper orifice for your location.

Heat-N-Glo Quality

Systems registered

by SGS ICS

 


background image

7

2

Getting Started

Introducing the Heat-N-Glo Gas Fireplaces

Heat-N-Glo “B” vent gas fireplaces are designed to operate

with all exhaust gases expelled to the outside.
The information contained in this 

Installers Guide

, unless

noted  otherwise,  applies  to  all  models  and  gas  control

systems. Gas fireplace diagrams, including the dimensions,

are shown in this section.

Pre-install Preparation

This gas fireplace and its components are tested and safe

when installed in accordance with this 

Installers Guide

.

Report  to  your  dealer  any  parts  damaged  in  shipment,

particularly the condition of the glass. 

Do not install any

unit with damaged, incomplete, or substitute parts.

The  vent  system  components  are  shipped  in  separate

packages. The gas logs are packaged separately and must

be field installed.

Read  all  of  the  instructions  before  starting  the

installation. Follow these instructions carefully during

the installation to ensure maximum safety and benefit.

Failure  to  follow  these  instructions  will  void  the

owner’s warranty and may present a fire hazard.

When planning a fireplace installation, it’s necessary to

determine:

•

Where the unit is to be installed.

•

The vent system configuration to be used.

•

Gas supply piping.

•

Electrical wiring.

•

Framing and finishing details.

•

Whether optional accessories — devices such as a fan,

wall switch or remote control — are desired.

If the fireplace is to be installed on carpeting or tile, or on

any  combustible  material  other  than  wood  flooring,  the

fireplace must be installed on a metal or wood panel that

extends the full width and depth of the fireplace.

Warranty

The Heat-N-Glo Warranty will be voided by, and Heat-N-Glo

disclaims any responsibility for, the following actions:

• Installation of any damaged fireplace or vent system com-

ponent.

• Modification of the fireplace or vent system.
• Installation other than as instructed by Heat-N-Glo.
• Improper positioning of the gas logs or the glass door.
• Installation and/or use of any component part not manu-

factured and approved by Heat-N-Glo, not withstanding

any independent testing laboratory or other party approval

of such component part or accessory.

ANY  SUCH ACTION  MAY  POSSIBLY  CAUSE A  FIRE

HAZARD.

 


background image

8

Figure 1. Diagram of the ST-38GTV

19 5/16 (491mm)

22 1/6 (560mm)

VENT COLLAR

 11 1/32 (280mm)

38 1/4

(972mm)

GAS LINE

ACCESS

8 (203mm)

11 (279mm)

31 1/2 (800mm)

38 5/8 (981mm)

35 3/4

 (908mm)

3 (76mm)

ELECTRICAL

ACCESS

5 5/8 (143mm)

LEFT SIDE

FRONT

RIGHT SIDE

PIPE CLAMP

1/2"

SPACERS

BLOWER

ACCESS

LABELS

GLASS DOOR

GAS VALVE

HOOD

ELECTRICAL
ACCESS

GAS LINE
ACCESS

OUTSIDE
AIR ACCESS

GRATE

SIDE REFRACTORY

VENT COLLAR

TOP LEDGE SPACER

CONTROL KNOB

GAS VALVE

VALVE ACCESS
PLATE

PIEZO IGNITOR

11 (280mm)

4 3/4

 (121mm)

 


background image

9

3

Installing the Fireplace

Step 1.       Locating the Fireplace

The diagram below shows space and clearance require-

ments  for locating a fireplace within a room.

Minimum Clearances from the Fireplace to

Combustible Materials

Inches

mm

Glass  Front .......................... 3 6.................914

Floor ....................................... 0 .................... 0

Metal  Ends ........................... 1/2 .................1 3

Top .......................................... 3 ...................7 6

Ceiling* ................................. 3 1.................787

   Figure 2.    Fireplace Dimensions, Locations,

                     and Space Requirements

Figure 3. Framing Dimensions

Step 2.  Framing the Fireplace

Fireplace framing can be built before or after the fireplace is

set in place. Framing should be positioned to accommo-

date wall coverings and fireplace facing material. The dia-

gram below shows framing reference dimensions.

CAUTION:

 MEASURE FIREPLACE DIMENSIONS AND

VERIFY FRAMING METHODS AND WALL COVERING

DETAILS BEFORE FRAMING.

NOTE: If an optional blower (Model FK-200) is to be

installed, a 12 x 12 inch (305mm x 305mm) access hole

must be framed into the wall (see Figure 3).

Minimum Clearances from the B-Type Vent Pipe

to Combustible Materials

Inches

mm

Vertical  Sections

. ............. 1 ................... 2 5

Horizontal Sections

Top ......................................... 1 ................... 2 5

Bottom .................................. 1 ................... 2 5

Sides ..................................... 1 ................... 2 5

At Wall Firestops

Top ......................................... 1 ................... 2 5

Bottom .................................. 1 ................... 2 5

Sides ..................................... 1 ................... 2 5

* The clearance to the ceiling is measured from the top

of the unit, excluding the stand-offs (see Figure 13).

36"

1"

36"

GLASS

GLASS

Clearance Requirements

The top and ends of the fireplace are defined by stand-offs.

The minimum clearance to a perpendicular wall extending

past the face of the fireplace is one inch (25mm). The metal

ends of the fireplace may 

NOT

 be recessed into combustible

construction.

Framing should be constructed of

2 X 4 lumber or heavier.

Model

A

   B

C

ST-38GTV

39 5/8   38 3/4

21 1/16

NOTE: DIMENSIONS SHOWN IN INCHES

A

B

C

12"

12"

TOP VIEW

 


background image

10

Negative Pressure warning

:  When negative pressure is

present, an atmospherically vented fireplace (with a draft

hood) may not function properly and it may down draft.  In

the case of a gas appliance, spillage of the combustion

gases may occur.  

This may create a dangerous carbon

monoxide situation in the house.

The causes of negative pressure to a house can include

the following:
• Stack effect in the building.
• Exhaust  only  appliances  (mechanically  and

atmospherically vented).

• Inadequate  make-up  air  (which  is  increasingly  more

prevalent in new construction).

NOTE: 

This fireplace will operate correctly only if adequate

ventilation is provided to allow proper draft to the fireplace

system.  Heat-N-Glo  assumes  no  responsibility  for  the

improper performance of the fireplace system caused by

inadequate draft due to environmental conditions, down

drafts,  tight  sealing  construction  of  the  structure,  or

mechanical exhausting devices which create a negative air

pressure within the structure where the fireplace is located.
It is recommended that all natural venting non-air tight gas

fireplaces have outside air connected to them. It is also

recommended that the building be mechanically or passively

balanced to allow atmospherically vented appliances, such

as  top  vented  gas  fireplaces  with  draft  hoods,  to  draft

properly.  If the home experiences negative pressure or is

likely to experience negative pressure, connection to an

outside air source is mandatory.

Installing Optional Outside Make-up Air: 

This unit is

equipped to accept outside air.  By using outside make-up

air, the amount of room air used for combustion will be

reduced.  It is recommended that an AK-225 air kit be used

with this appliance.

WARNING: IN A NEGATIVE PRESSURE CON-

DITION (LIKELY  TO OCCUR IN NEW HOMES

THAT DO NOT HAVE ADEQUATE MAKE-UP AIR) THE

OUTSIDE AIR KIT MUST BE INSTALLED TO OB-

TAIN PROPER PERFORMANCE AND TO HELP PRE-

VENT SPILLAGE OF COMBUSTION GASES.

Step 3.   Negative Pressure Make-up Air

Figure 4.  Make-up Air

!

A 4-inch side collar and a 4-inch flexible air duct must be

installed to the outer wrap of the fireplace.  See Figure 4.

After removing and discarding the outside air cover plate

attach the side collar to the outer wrap of the fireplace  using

sheetmetal screws. Attach one end of the flex duct to the

side collar and the other end of the duct to the  termination

cap.  Use plastic tie straps to secure the ends of the flex

duct to the collar.

Detailed installation instructions for Model AK-225 Outside

Air kit are found in the kit. This kit cannot be used in Canada.

OUTSIDE AIR
COVER PLATE

OUTSIDE AIR
COLLAR

AIR DUCT

 


background image

11

!

!

Step 4.  Installing the Vent System
A.  Vent System Approvals

Model  ST-38GTV  is  approved  to  use  5-inch  (127mm)

diameter B-type vent. B-type vent must be used when the

vent system is within combustible construction.
This model may also use single wall rigid or flexible gas

vent 

IF 

and 

ONLY IF

 the vent system is installed within

non-combustible construction such as a masonry chimney.

The same diameter noted above for B-type vent must be

used for single-wall vent. See Figure 5.

B.  System Components.

Vent System Configuration

MAXIMUM 

TOTAL HORIZONTAL RUN = 13 FT.

MAXIMUM 

TOTAL VERTICAL RISE = 10 FT.

MAXIMUM NO. of ELBOWS: 

 2 -90

o

 plus 4 - 45

o

, or  8 - 45

o

.

Plan and install the vent system using the parameters shown

above.

WARNING: YOU MUST NOT EXCEED THESE

PARAMETERS.

Connect a B-Type vent component to the flue outlet collar.

Look at top inside of the firebox to check that the vent pipe

is attached to the unit.  

NOTE: It is always better to first

attach  a  straight  section  of  vent  to  the  unit  before

attaching an elbow.   Avoid using elbows in the vent

system if possible.

A 90-degree elbow can be attached directly to the unit.  If it

is, it can be followed by a 

MAXIMUM 

13-feet horizontal

run, a second 90-degree elbow ending in a vertical position,

and  a 

MINIMUM 

10-feet  vertical  rise  ending  in  a  listed

termination cap for the vent pipe.
Continue to add vent components, until the vent run is

completed.

WARNING: YOU MUST NOT EXCEED A TOTAL

MAXIMUM HORIZONTAL RUN OF 13 FEET FOR

THE ENTIRE VENT SYSTEM AND THERE MUST

BE A TOTAL VERTICAL MINIMUM RISE OF 10-

FEET IN ALL VENT SYSTEM CONFIGURATIONS

USED ON THESE FIREPLACES.

NOTE:  The  vent  termination  must  be  in  a  vertical

position and the termination cap must be listed for

the vent pipe used

.

Figure 5. Vent System Attachment

!

Consult Local Building Code Officials and Codes for proper

vent system installations.

WARNING: THIS GAS FIREPLACE MUST NEV-

ER BE VENTED BY CONNECTING TO A CHIM-

NEY FLUE SERVING A SEPARATE SOLID FUEL

BURNING APPLIANCE.

B-TYPE

VENT PIPE

VENT COLLAR

LISTED

TERMINATION

CAP

LISTED

SINGLE-WALL

GAS VENT

NON-COMBUSTIBLE

CONSTRUCTION

13 FT.

MAXIMUM

10 FT.

MINIMUM

 


background image

12

Step 5.  Positioning, Leveling, and

               Securing the Fireplace

The diagram below shows how to properly position, level,

and secure the fireplace.

Figure 7.  Proper Positioning, Leveling

                and Securing of a Fireplace

• Place the fireplace into position (see Figure 7).

• Level the fireplace from side to side and from front to

back.

• Shim the fireplace with non-combustible material, such

as sheet metal, as necessary.

• Secure the fireplace to the framing using nails or screws

through the nailing tabs.

ROOF PITCH

H (MIN.) FT.

FLAT TO 6/12

1.0

6/12 TO 7/12

1.25

OVER 7/12 TO 8/12

1.5

OVER 8/12 TO 9/12

2.0

OVER 9/12 TO 10/12

2.5

OVER 10/12 TO 11/12

3.25

OVER 11/12 TO 12/12

4.0

OVER 12/12 TO 14/12

5.0

OVER 14/12 TO 16/12

6.0

OVER 16/12 TO 18/12

7.0

OVER 18/12 TO 20/12

7.5

OVER 20/12 TO 21/12

8.0

Figure 6. Vent Termination

!

C.  Bedroom Installation in Canada

This  model 

MUST  NOT

  be  vented  into  a  vent  system

installed exterior to a building.  The part of the vent system

above the roof line can be exterior to the building.

D. Vent Termination

WARNING:  MAJOR  U.S.  BUILDING  CODES

SPECIFY MINIMUM CHIMNEY AND/OR VENT

HEIGHT ABOVE  THE  ROOF  TOP.    THESE

MINIMUM HEIGHTS ARE NECESSARY IN THE

INTEREST OF SAFETY.  FIGURE 6 AND TABLE

SHOW MINIMUM HEIGHTS, PROVIDED THE

TERMINATIONS  CAP  IS AT  LEAST  8-FEET

FROM A VERTICAL WALL.

H (MIN.)-MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

VENT CAP

LOWEST DISCHARGE OPENING

12

X

ROOF PITCH IS X/12

NAILING TABS

 


background image

13

!

Figure 9.   Gas Supply Line

• At the gas line access hole, use insulation to re-pack

the space around the gas pipe.

• Insert insulation from the outside of the fireplace and

pack the insulation tightly to totally seal between the

pipe and the outer casing.

Step 7.  The Gas Supply Line

NOTE: Have the gas supply line installed in accordance

with  local  building  codes  by  a  qualified  installer

approved and/or licensed as required by the locality.

!

USE A WRENCH ON 

SHUT-OFF VALVE WHEN 

TIGHTENING GAS LINE

GAS VALVE 

FLEX

CONNECTOR

MANUAL

SHUT-OFF VALVE 

WARNING: THIS UNIT IS NOT FOR USE WITH

SOLID FUEL.

!

!

Step 6. The Gas Controls System

WARNING: DO NOT USE AN OPEN FLAME

TO CHECK FOR GAS LEAKS

.

GAS

ACCESS

Two types of gas control systems are used with these models:

Standing Pilot Ignition

 and 

Direct Spark Ignition (DSI).

Standing Pilot Ignition System

This system includes millivolt control valve, standing pilot,

thermopile/thermocouple flame sensor, and piezo ignitor.

WARNING:  110-120  VAC  MUST  NEVER  BE

CONNECTED  TO A  CONTROL  VALVE  IN A

MILLIVOLT SYSTEM.

Direct Spark Ignition (DSI) System

This system includes a 24V control valve, electronic module,

transformer, and spark ignitor/flame sensor.

WARNING:  110-120 VAC MUST BE WIRED TO

THE FIREPLACE JUNCTION BOX IN A DSI

SYSTEM.

NOTE: Before the first firing of the fireplace, the gas

supply line should be purged of any trapped air.
NOTE: Consult local building codes to properly size

the gas supply line leading to the 1/2 inch (13mm) hook-

up at the unit.

This gas fireplace is designed to accept a 1/2 inch (13mm)

gas supply line.
To install the gas supply line:
• A listed (and State of Massachusetts approved) 1/2 inch

(13mm) tee-handle manual shut-off valve and a listed  flex-

ible gas connector are connected to the 1/2 inch (13mm)

inlet of the control valve. 

NOTE:

 If substituting for these

components, please consult local codes for compliance.

• Locate the gas line access hole in the outer casing of

the fireplace.

• The gap between the supply piping and gas access hole

can be plugged with non-combustible insulation to pre-

vent cold air infiltration.

• Insert the gas supply line through the gas line hole, and

connect it to the shut-off valve.

• When attaching the pipe, support the control so that the

lines are not bent or torn.

• After the gas line installation is complete, use a soap

solution to carefully check all gas connections for leaks.

Figure 8.   Gas Supply Line

3/8” (10mm)

STANDING PILOT

DSI IGNITION

3/16” (5mm)

CERAMIC

INSULATOR

IGNITOR

1/2” (13mm)

 


background image

14

!

Step 9.  Wiring the Fireplace

NOTE: Electrical wiring must be installed by a licensed

electrician.

CAUTION: DISCONNECT REMOTE CONTROLS IF YOU

ARE ABSENT FOR EXTENDED TIME PERIODS. THIS

WILL PREVENT ACCIDENTAL FIREPLACE OPERATION.

For Standing Pilot Ignition Wiring
Appliance Requirements

This appliance 

DOES NOT 

require 110-120 VAC to operate.

For Direct Spark Ignition (DSI) Wiring
Appliance Requirements

This appliance requires that 110-120 VAC be wired to the

factory installed junction box. Maintain correct polarity when

wiring the junction box.

Optional Accessories

Optional remote control kits require that 110-120 VAC be

wired to the fireplace junction box.

Wall  Switch

Position the wall switch in the desired position on a wall. Run

a maximum of 25 feet (7.8m) or less of 16 A.W.G. minimum

wire and connect it to the fireplace ON/OFF switch pigtails.

CAUTION: LABEL ALL WIRES PRIOR TO DISCONNEC-

TION WHEN SERVICING CONTROLS. WIRING ERRORS

CAN CAUSE IMPROPER AND DANGEROUS OPERA-

TION. VERIFY PROPER OPERATION AFTER SERVICING.

WHITE T2

BLACK S1

THERMOPILE

GAS VALVE

RED T1

3\16" PIGGYBACK

CONNECTOR

TH

TH

SWITCH

ON/OFF

THERMOSTAT OR REMOTE

OPTIONAL WALL SWITCH,

LIMIT SWITCH

OFF

ON

BLACK S2

HI-TEMP

GROUND

BLACK L1

BLACK L2

PIGTAIL

REMOTE SWITCH

TP

TP

Figure 10. Standing Pilot Ignition Wiring Diagram

Wall  Switch

Position the wall switch in the desired position on a wall.

Run a maximum of 25 feet (7.8 m) or less length of 18

A.W.G. minimum wire and connect it to the fireplace ON/

OFF switch pigtails.

CAUTION: LABEL ALL WIRES PRIOR TO DISCONNEC-

TION WHEN SERVICING CONTROLS. WIRING ERRORS

CAN CAUSE IMPROPER AND DANGEROUS OPERA-

TION. VERIFY PROPER OPERATION AFTER SERVICING.

WARNING: DO NOT CONNECT 110-120 VAC TO

THE GAS CONTROL VALVE OR WALL SWITCH

OR  THE  APPLIANCE  WILL  MALFUNCTION

AND THE VALVE WILL BE DESTROYED

.

Optional Accessories

Optional fan and remote control kits require that 110-120

VAC be wired to the factory installed junction box before

the fireplace is permanently installed.

Step 8.   Gas Pressure Requirements

Pressure requirements for Heat-N-Glo gas fireplaces

are shown in the table below.

Pressure

Natural Gas

Propane

Minimum

5.0 inches

11.0 inches

Inlet Pressure

w.c.

w.c.

Maximum Inlet

14.0 inches

14.0 inches

Gas Pressure

w.c.

w.c.

Manifold

3.5 inches

10.0 inches

Pressure

w.c.

w.c.

A one-eighth (1/8) inch (3 mm) N.P.T. plugged tapping is

provided on the inlet and outlet side of the gas control for a

test gauge connection to measure the manifold pressure.
The  fireplace  and  its  individual  shut-off  valve  must  be

disconnected from the gas supply piping system during

any pressure testing of the system at test pressures in

excess of one-half (1/2) psig (3.5 kPa).
The fireplace must be isolated from the gas supply piping

system by closing its individual shut-off valve during any

pressure testing of the gas supply piping system at test

pressures equal to or less than one-half (1/2) psig (3.5 kPa).

 


background image

15

Figure 11. Fan Wiring Diagram

OUTER
CASTING

INNER 
CASTING

BLOWER
FLANGE

LOWER
MOUNTING
FLANGE

BLOWER

ASSEMBLY

#6 X 1/2" SCREW

UPPER

MOUNTING

BRACKET (B)

OIL HOLES

BLOWER

ASSEMBLY

ELECTRICAL

JUNCTION BOX

MOTOR

120 VOLT

HOUSE WIRING

GROUND

WHITE

BLACK

GROUND

SCREW

WALL SWITCH
OR SPEED CONTROL

WALL JUNCTION

BOX (NOT SUPPLIED)

BLOWER 
MOTOR

W

G B

GROUND SCREW

FIREPLACE
JUNCTION BOX

Figure 12. Direct Spark Ignition (DSI) Diagram

SPARK

ELECTRODE

FLAME

SENSOR

ON/OFF

O

RAN

G

E

IGNITION
MODULE

YE

L

L

OW

GREEN

RED

S1

GND

V2

V1

RED

TH

PURPLE

SOLENOID OPERATED GAS VALVE

BLACK

RED

HI-TEMP

LIMIT SWITCH

BLACK

BLACK

BLACK

TRANSFORMER

WH

IT

E

120 VAC

JUNCTION

BOX

L1

(HOT)

L2

(NEUTRAL)

PURPLE

RED

TO REMOTE

F

M

FLAME SENSOR/SPARKER

IGNITION

MODULE

GAS

VALVE

TRANSFORMER

REMOTE OUTLET

ON/OFF SWITCH

FAN OUTLET

CONNECTORS

HOT

GROUND

NEUTRAL

 


background image

16

CAUTION: IF JOINTS BETWEEN THE FINISHED WALLS

AND THE FIREPLACE SURROUND (TOP AND SIDES)

ARE  SEALED, A  300°

 

F.  MINIMUM  SEALANT  MATE-

RIAL MUST BE USED.  THESE JOINTS ARE NOT RE-

QUIRED TO BE SEALED. ONLY NON-COMBUSTIBLE

MATERIAL  (USING  300°  F.  MINIMUM ADHESIVE,  IF

NEEDED) CAN BE APPLIED AS FACING TO THE FIRE-

PLACE  SURROUND.  SEE  THE  DIAGRAM  BELOW.

Hearth Extensions

A hearth extension may be desirable for aesthetic reasons.

However, ANSI or CAN/CGA testing standards 

do not

 require

hearth extensions for gas fireplace appliances.

Installing the Trim

Combustible materials may be brought up to the specified

clearances on the side and top front edges of the fireplace,

but 

MUST NEVER

 overlap onto the front face. The joints

between the finished wall and the fireplace top and sides

can only be sealed with a 300° F. (149° C) minimum sealant.
Install  optional  marble  and  brass  trim  surround  kits  as

desired. Marble, brass, brick, tile, or other non-combustible

materials can be used to cover up the gap between the

sheetrock and the fireplace.
Do not obstruct or modify the air inlet/outlet grilles. When

overlapping on both sides, leave enough space so that the

controls can be accessed and the trim door and glass door

can be removed.

Step 11. Installing Trim, Logs & Ember Material

Figure 14.

Sealant  Material

Placing the Ember Material

Two separate bags of ember material are shipped with this

gas fireplace:
• The bag labeled Golden Ember (GE-93) is flame colo-

rant material.

• The bag labeled Glowing Ember (050-721) is standard

glowing ember material.

To place the ember material:
• Lift the trim door up and out from the unit.
• Remove the wing nuts and screws around the glass door.

Figure 15.  Glass Assembly

STUD

HEADER

FINISHED

WALL

SEAL JOINT

(300° F/149° C MIN.)

GLASS

ASSEMBLY

MOUNTING

STUD

GLASS CLIP

WING NUT

Positioning the Logs

If the gas logs have been factory installed they should not

need to be positioned.
If the logs have been packaged separately, refer to the

installation instructions that accompany the logs.

 Save the

log instructions with this manual.

If sooting occurs, the logs might need to be repositioned

slightly to avoid excessive flame impingement.

Step 10.  Finishing

Figure 13 shows the minimum vertical and corresponding

maximum horizontal dimensions of fireplace mantels or other

combustible projections above the top front edge of the

fireplace. See Figures 2 and 3 for other fireplace clearances.
Only non-combustible materials may be used to cover the

black fireplace front.

WARNING: WHEN FINISHING THE FIREPLACE,

NEVER OBSTRUCT OR MODIFY THE AIR IN-

LET/OUTLET GRILLES IN ANY MANNER.

Figure 13.

Minimum Vertical and Maximum Horizontal

Dimensions of Combustibles above Fireplace

!

12"

MINIMUM

8" MAXIMUM

MANTLE

HOOD

31”

CEILING

 


background image

17

Step 12.  Before Lighting  the Fireplace

Before

 lighting the fireplace, be sure to do the following:

Remove all paperwork from underneath the fireplace.
Review safety warnings and cautions

• Read the 

Safety and Warning Information

 section at

the beginning of this 

Installers Guide

.

Double-check for gas leaks

• Before lighting the fireplace, double-check the unit for

possible gas leaks.

Double-check vent terminations and front grilles for

obstructions.

• Before lighting the fireplace, double-check the unit for

possible obstructions that could be blocking the vent ter-

minations or the front grilles.

Double-check for faulty components

• Any component that is found to be faulty 

MUST BE

 re-

placed with an approved component. Tampering with the

fireplace components is 

DANGEROUS

 and voids all war-

ranties.

A small amount of air will be in the gas supply lines. When

first lighting the fireplace, it will take a few minutes for the

lines to purge themselves of this air. Once the purging is

complete, the fireplace will light and will operate normally.
Subsequent lightings of the fireplace will not require this

purging of air from the gas supply lines,

 unless

 

the gas

valve has been turned to the OFF position

, in which

case the air would have to be purged.

NOTE:

 The fireplace should be run 3 to 4 hours on the initial

start-up. Turn it off and let it cool completely. Remove and

clean the glass. Replace the glass and run the fireplace for

an additional 8 hours. This will help to cure the chemicals

used in the paint and logs.

Step 13.   Lighting the Fireplace

You’ve reviewed all safety warnings, you’ve checked the

fireplace  for  gas  leaks,  you  know  the  vent  system  is

unobstructed, and you’ve checked for faulty components.

Now you’re ready to light the fireplace.

WARNING: PLEASE REFER TO THE USER’S

MANUAL FOR ALL CAUTIONS, SAFETY,  AND

WARNING  INFORMATION  PERTAINING  TO  THE

LIGHTING AND OPERATION OF THE FIREPLACE.

After the Installation

LEAVE THIS INSTALLATION MANUAL WITH

THE APPLIANCE FOR FUTURE REFERENCE.

!

!

GLASS SPECIFICATIONS:
ST-38GTV

      18 3/4” X 31”

TEMPERED

Figure 16.   Placement of the Ember Material

EMBER 

MATERIALS

• Remove the glass door from the unit.
• Cover the top of the burner with a single layer of ember

material. Then sprinkle GE-93 on top of the burner.

• Save the remaining ember materials for use during fire-

place servicing.

• Replace the glass door and a front trim door on the unit.

Heat-N-Glo fireplaces manufactured with tempered glass

may be installed in hazardous locations such as bathtub

enclosures as defined by the CPSC.  The tempered glass

has been tested and certified to the requirements of ANSI

Z97.1-1984  and  CPSC  16  CFR  1202.  (Safety  Glazing

Certification Council SGCC # 1595 and 1597.  Architectural

Testing, Inc. Reports 02-31919.01 and 02-31917.01.)

This statement is in compliance with CPSC 16 CFR Section

1201.5 “Certification and labeling requirements” which refers

to 15 USC 2063 stating “…Such certificate shall accompany

the product or shall otherwise be furnished to any distributor

or retailer to whom the product is delivered.”

Some local building codes require the use of tempered glass

with permanent marking in such locations. Glass meeting

this requirement is available from the factory. Please contact

your dealer or distributor to order.

 


background image

18

4

Maintaining and Servicing Your Fireplace

Fireplace Maintenance

Although the frequency of your fireplace servicing and main-

tenance will depend on use and the type of installation, you

should have a qualified service technician perform an appli-

ance check-up at the beginning of each heating season.

See the table below for specific guidelines regarding each

fireplace maintenance task.

IMPORTANT: TURN OFF THE GAS BEFORE SERVICING

YOUR FIREPLACE.

Replacing old ember material
Frequency:

 Once annually, during the checkup.

By:

 Qualified service technician.

Task:

 Brush away loose ember material near the burner.

Replace old ember material with new dime-size and shape

pieces of Golden Ember (DE-93) and Glowing Ember (050-

721). New ember material should be placed alternately on

top of the burner - a layer of Golden Ember, a layer of Glowing

Ember, and so on. Save the remaining ember material and

repeat  this  procedure  at  your  next  servicing.  For  more

information, see 

Placing Ember Material

.

Cleaning Burner and Controls
Frequency:

 Once annually.

By:

 Qualified service technician.

Task: 

Brush or vacuum the control compartment, fireplace

logs and burner areas surrounding the logs.

Checking Flame Patterns, Flame Height
Frequency:

 Periodically.

By:

 Qualified service technician/Home owner.

Task:

 Make a visual check of your fireplace’s flame patterns.

Make sure the flames are steady - not lifting or floating (see

Figure 17). The flame sensor (DSI) or thermopile (standing

pilot) tips should be covered with flame (see Figure 8).

Checking Vent System
Frequency:

  Before  initial  use  and  at  least  annually

thereafter, more frequently if possible.

By:

 Qualified service technician/Home owner.

Task: 

Inspect the external vent cap on a regular basis to

ensure that no debris is interfering with the flow of air. Inspect

entire vent system for proper function.

Cleaning Glass Door

Frequency:

  After the first 3 to 4 hours of use. As neces-

sary after initial cleaning.

By:

 Home owner.

Task: 

Remove and clean glass after the first 3 to 4 hours of

use. After the initial cleaning, clean as necessary, particu-

larly after adding new ember (flame colorant) material. Film

deposits on the inside of the glass door should be cleaned

off using a household glass cleaner. 

NOTE: DO NOT handle

or attempt to clean the door when it is hot and DO

NOT use abrasive cleaners.

Figure 17. Burner Flame Patterns