PDF User Manual

  1. Home
  2. Manuals
  3. Genie Lift Tools GS-2669 Operator's Manual

Genie Lift Tools GS-2669 Operator's Manual

Lift Tools GS-3369\ Lift Tools GS-4069

Made by: Genie
Type: Operator's Manual
Category: Scissor Lifts
Pages: 12
Size: 2.51 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

 

 

 

 

 

 

   

Operator's Manual Supplement 

 

 

 

 

 

 

Lift Tools™ Material Carrier 

 

 

 

 

 

 

 

 

 

 

 

 

GS

-2669 

 

 

 

 

GS

-3369 

 

 

GS

-4069 

 

 

 

 

ANSI/CSA Models

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

First Edition 
First Printing 
Part No. 1288240GT 

 

 

 

 

 

 

 


background image

Operator's Manual Supplement

 

First Edition • First Printing

 

Introduction 

 

 

Lift Tools™ Material Carrier

 

Part No. 1288240GT 

 

Introduction 

 

Danger 

Failure to obey the instructions and 
safety rules in this manual will result 
in death or serious injury. 

Note: These installation instructions only apply 
to the Genie models listed on the front cover.

 

 

Material Carrier Safety 

Read, understand and obey all warnings and 
instructions provided with the material carrier. 

Do not exceed the rated platform capacity. The 
weight of the material carrier assembly will reduce 
the rated platform capacity and must be subtracted 
from the total platform load. 

The material carrier assembly weighs 80 lbs/36 kg. 

Be sure the material carrier is securely installed. 

When the material carrier assembly is attached, 
this manual should be considered a permanent 
part of your machine and should remain with the 
machine at all times. 

 

Symbol and Hazard Pictorials 
Definitions 

 

Material Carrier weighs 
80 lbs/36 kg. 

 

Read the supplement manual,   
part number 1288240GT. 

 

80 lb

s

 /

36 k

g

1288240GT

 


background image

First Edition • First Printing

 

Operator's Manual Supplement

 

 Introduction 

 

 

Part No. 1288240GT

 

Lift Tools™ Material Carrier 

 

 

Pre-operation Inspection 

 

Be sure that the operator’s, safety manual, 
responsibilities manual and any necessary 
supplements are complete, legible and in the 
storage container located in the platform. 

 

Be sure that all decals are legible and in place. 

 

Inspect the work area for obstructions that 
could inhibit safe loading and unloading of the 
Material Carrier. 

Check the Material Carrier for damage, improperly 
installed or missing parts and unauthorized 
modifications. 

 

Nuts, bolts and other fasteners 

 

Cracks in structural components 

 

Dents or damage to the Material Carrier 

 

Decal Inspection 

Use the inspection to verify that all decals are 
legible and in place. 

Part No. 

Decal Description 

Qty

1287851GT 

Decal, Max Capacity 

2

 

 

 


background image

Operator's Manual Supplement

 

First Edition • First Printing

 

Operating Instructions 

 

 

Lift Tools™ Material Carrier

 

Part No. 1288240GT 

 

Operating Instructions 

Material Carrier Operation 

1

 

Verify the material carrier assembly and 
installation instructions have been followed 
properly and that the material carriers are 
secured to the platform railings. 

2

 

Place the load so that it rests in both material 
carriers. The length of the load should be 
parallel with the platform. 

3

 

Center the load in the material carrier. 

 

Tip-over hazard. The center of 
the load must be within the 
perimeter of the main deck of the
platform. 

4

 

Secure the load to each material carrier. Pass 
the nylon strap over the load. Connect the 
hook to the material carrier. Tighten the ratchet 
strap. 

5

 

Gently push and pull on the load to make sure 
the material carriers and load are secure. 

6

 

Keep the load secured when the machine is in 
motion. 

 

 

Tip-over hazard. The weight of 
the material carrier assembly 
and the load in the material 
carrier will reduce the rated 
platform capacity of the machine 
and must be factored into the 
total platform load. 

 

Tip-over hazard. The weight of 
the material carrier assembly 
and the load in the material 
carrier may limit the maximum 
number of occupants in the 
platform. 

 

Component damage hazard. Do 
not use the machine to place 
loads into position. 

Maximum Material Carrier Capacity 

GS-2669 

700 lbs

317 kg

GS-3369 

500 lbs

227 kg

GS-4069 

350 lbs

159 kg

Material Carrier Assembly Weight 

80 lbs

36 kg

 
 
 

 

 

WARNING

WARNING

WARNING

NOTICE

 


background image

First Edition • First Printing

 

Operator's Manual Supplement

 

 Installation 

Instructions 

 

 

Part No. 1288240GT

 

Lift Tools™ Material Carrier 

 

 

Installation Instructions 

 

 

Observe and Obey: 

 

This procedure shall be completed by a person 
authorized to install the Material Carrier. 

 

Immediately tag and remove from service a 
damaged or malfunctioning machine. 

 

Repair any machine damage or malfunction 
before operating the machine. 

 

Before Starting Installation: 

 

Read, understand and obey the safety rules 
and operating instructions in the appropriate 
operator's manual. 

 

Be sure that all necessary tools and parts are 
available and ready for use. 

 

Read this procedure completely and adhere to 
the instructions. Attempting shortcuts may 
produce hazardous conditions. 

Tools Required: 

3/8 inch wrench 

7/16 inch wrench 

9/16 inch wrench 

3/4 inch wrench 

3/8 inch socket 

7/16 inch socket 

9/16 inch socket 

3/4 inch socket 

Ratchet 

 

Components of Kit 12

88

2

3

9GT 

Description 

Genie part 

number

Qty.

U-bolt, 3/8-16 x 2 x 3, PLTD 

131681GT

8

Screw, HHF, 1/2-13 x 3.24, Gr 8, 
ZAG 

1256850GT

2

Nylock flange nut, 1/2-13, G, 
ZAG 

1274172GT

2

Nylock flange nut, 3/8-16, G, 
ZAG 

1274322GT

16

Assembly, Material carrier post 

1289762GT

2

Weldment, Rail attachment 

1288628GT

4

Weldment, Base 

1288629GT

2

Installation instructions 

1288240GT

1

 

 


background image

Operator's Manual Supplement

 

First Edition • First Printing

 

Installation Instructions 

 

 

Lift Tools™ Material Carrier

 

Part No. 1288240GT 

 

Note: Perform this procedure on a firm, level 
surface with the machine in the stowed position. 

Note: Refer to the illustrations for the material 
carrier mounting locations. 

Note: The material carrier mounted to the 
railing of the extension deck must be located 
within the perimeter of the main deck whether 
the platform extension deck is retracted or 
extended.

 

 

Tip over hazard. Failure to 
mount the material carrier as 
instructed, could result in the 
machine tipping over, causing 
death or serious injury. 

 

1

 

Mount the rail attachments to the to the 
platform using U-bolts and nylock flange nuts. 
Hand tighten. Genie part number 1288658GT, 
131681GT, 1274322GT. 

Note: Remove and discard the hex nuts and flat 
washers supplied with the U-bolts. 

 

 

2

 

Insert the material carrier post assemblies into 
the rail attachments. Genie part number 
1289762GT. 

Note: The ratchet straps must be located towards 
the center of the machine. 

3

 

Secure the base weldment to the post using 
the provided retaining fasteners. Torque to 
31 ft-lbs / 42 Nm. Genie part number 
1288629GT, 1256850GT, 1274172GT. 

 

 

main deck 

extension deck 

4

 

Secure the material carrier to the extension 
deck railing. Torque to 31 ft-lbs / 42 Nm. 

5

 

Align the material carriers and tighten the 
U-bolts. Torque to 31 ft-lbs / 42 Nm. 

6

 

Insert the supplement Operator's Manual into 
the manual storage box located in the platform. 

 

 

WARNING

 


background image

First Edition • First Printing

 

Operator's Manual Supplement

 

 Installation 

Instructions 

 

 

Part No. 1288240GT

 

Lift Tools™ Material Carrier 

 

 

Deck Retracted 

 

 

material carrier 

U-bolt and nylock flange nut 

swing gate 

main deck 

extension deck 

 

1

2

3

1

2

5

4

 


background image

Operator's Manual Supplement

 

First Edition • First Printing

 

Installation Instructions 

 

 

Lift Tools™ Material Carrier

 

Part No. 1288240GT 

 

Deck Extended 

 

 

material carrier 

U-bolt and nylock flange nut 

swing gate 

main deck 

extension deck 

 

1

2

3

1

2

5

4

 


background image

First Edition • First Printing

 

Operator's Manual Supplement

 

 Installation 

Instructions 

 

 

Part No. 1288240GT

 

Lift Tools™ Material Carrier 

 

 

Optional Location - Deck retracted 

 

 

 


background image

Operator's Manual Supplement

 

First Edition • First Printing

 

Installation Instructions 

 

 

10 

Lift Tools™ Material Carrier

 

Part No. 1288240GT 

 

Optional Locations - Deck Extended 

 

Tip-over hazard. Do not install 
more than one set of material 
carriers in the platform. The 
illustration represents the two 
possible locations the material 
carrier can be installed when the 
platform is extended. 

 

 

DANGER

 


background image

First Edition • First Printing

 

Operator's Manual Supplement

 

 Installation 

Instructions 

 

 

Part No. 1288240GT

 

Lift Tools™ Material Carrier 

11 

 

 

This page intentionally left blank. 

 

Lift Tools™ Material Carrier 

Part No. 1288240GT 

Operator's Manual Supplement 

First Edition • First Printing 

 

 

 


background image