PDF User Manual

  1. Home
  2. Manuals
  3. Clima-Flex CLIC SERIES Installation Manual

Clima-Flex CLIC SERIES Installation Manual

Made by: Clima-Flex
Type: Installation Manual
Category: Chiller
Pages: 24
Size: 1.80 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

 

 

CLIC SERIES 

INSTALLATION 

MANUAL 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

 

Table of Contents 

General Description

……………………………………………………………………………………...3 

Advantages of the Clima-Flex 

units……………………………………..……………………4 

Installation Diagrams…..………………………………………………...………………….....6 

Nomenclature

……………………………………………………………………………………………..7 

Electrical Diagram

……………………………………………….…………………………………….....8 

Technical Sheet

…………………………………………………..………………………………………10 

Dimensions

………………………………………………………………………………………………..11 

Installation and unit startup……….………………….………………………………………………….12 

 

Installation

…………………………………….………………………………………………....13 

 

Pre-

startup Checklist………………………………………….………………………………..14 

 

Energy / Power supply inspection….....……………………………….……………………...15 

 

Control panel inspection………………………………………………………………………..16 

 

Initial Startup…………………………………………………………………………….……....16 

Compressors

…………………………………………………………………………………….………..17 

Maintenance

……………………………………………………………………………………………....19 

 

Hydraulic 

Maintenance…..……………………………………………………………………...19 

 

Electrical Maintenance..

………………………………………………………………….……..19 

 

Physical Inspection

……………………………………………………………………………...19 

Hydraulic Connection

………………………………………………………………….…………..……...21 

 

Nipple Connection

………………………………………………………….……..……………..21 

 

Head Connection

…………………………………………………………….…………………..23 

Hydraulic Connection Diagram

……………………………………………………..…………………...25 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

 

1.  GENERAL  DESCRIPTION 

GENERAL DESCRIPTION 

Clima-Flex chilled water generator units are controlled by 
technically specialized software, scroll type compressors, 
evaporators, hydronic components (optional) and various 

safety protections. The units operate with refrigerant R-410A. 

EQUIPMENT 

Factory assembled. All piping, wiring and controls needed for 

operation are integrated inside the units 

MODULE 

Hot dipped galvanized base aluminum frame, Pintro sheet 

panels insulated with anticorrosive film, panels for easy 

access for maintenance without compromising the stability of 

the unit. 

COMPRESORES 

Hermetic scroll compressors, modulating and variable speed 

(inverter). 

CONDENSERS 

High efficiency condenser made of Microchannel tube. 

Condensers can be ordered with anticorrosive coating. 

Water-cooled units use plate type heat exchangers. 

EVAPORATORS 

The evaporators are compact and use plate heat 

exchangers. Both coolant and hydraulic connections are 

properly insulated. 

FANS 

Centrifugal long distance discharge fans or axial low noise 

operation. 

COMPONENTS 

Refrigeration Controls 

The units have solenoid valves, expansion valves, dehydrate 

filters and service valves. 

 

 

 

ELECTRICAL COMPONENTS 

All units come with a control panel, which contains all the 

safety and protection devices against external and internal 

overheating, compressor protection controls, flow and power 

failure detection, and freezing protection. The control panel 

includes indicator LED lights. 

HYDRONIC COMPONENTS (OPTIONAL) 

Water circulation pump 

The water pump is fully enclosed and has an anti-corrosion 

casing. 

Water expansion tank 

Installed to absorb the thermal expansion of water has a 2-

gallon capacity. 

CONTROL 

All Clima-Flex units can be connected to the internet. This 

allows for remote control and operation of the units, as well 

as remote diagnostics and follow-up maintenance (graphs, 

trends, cycle times, alarms, diagnostics, etc.), installation is 

simple and flexible using on site internet access. 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

1.1.  CLIMA-FLEX UNITS ADVANTAGES 

 

 

 

 

 

 

 

 

 

 

 

Clima-Flex  CLIC  units  leave  the  factory  as  a kit  ready  to be  installed  outdoors  at  both  the  floor  or 
ceiling  level.  The  use  of  air-cooled  condensers  eliminates  the  cost  and  the  need  to  install  and 
maintain a cooling tower. 

 

The  CLIC  family  has  a  smaller  footprint  and  lower  weight  than  the  competition.  Installation  of  the 
cold  water  pipes  is  also  easier.  All  CLIC  units  leave  the  factory  with  the  water  quick  connect 
connections  installed  and  ready  to  be  used.  Grooved  or  threaded  water  connections  are  also 
available  for  easy  installation.  Optionally  the  units  may  require  a  pumping  module;  this  module 
reduces installation time and space dedicated to a pump room. 

 

All Clima-Flex CLIC units have been tested on the factory to ensure proper operation. 

 

Clima-Flex  CLIC  units  are  designed  to  require  less  service  calls.  The  scroll  compressors  can  last 
hundreds  of  thousands  of  hours  of  continuous  operation  in  different  applications  and  conditions. 
The Adsil special anticorrosive coating ensures longer life and better performance. 

 

The  components  and  control  sequences  used  in  our  units  are  designed  to  keep  CLIC  Clima-Flex 
units always running, safety and health monitoring systems optimize performance on the go. 

 

The units are designed to meet the AHRI Standard 55/590 and the UL-1995 standard security. 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

 

EFFICIENCY 

CLIMA-FLEX

  water  chillers  are  designed  to  comply  with  all  requirements  on  all  commercial 

projects.  Air  cooled 

CLIC  CLIMA-FLEX 

units  may  be  applied  in  many  ways;  the  units  can  be 

installed  as  stand  alone  or  in  any  number  combination  to  get  the  exact  required  capacity  for  the 
project  demands.  The  operation  allows  modulating  in  accordance  with  the  building  thermal  load 
variations, and achieving the desired temperature in a precise and fast manner with high efficiency 
and minimum energy consumption. 
 

CLIC CLIMA-FLEX 

unit capacity ranges from 25 to 275 Tons of cooling.  

 
 
 

OPERATION 

CLIV  CLIMA-FLEX 

units  have  reduced  vibration  levels  making  them  virtually  silent.  The  overall 

design allows for easy, fast, and low price installation. 

 

 

 

QUALITY 

Each unit is carefully manufactured and individually tested under strict international standards. 

CLIC 

CLIMA-FLEX 

units have state of the art components that offer a high quality product. 

 

 

ENVIRONMENTALLY FRIENDLY

 

CLIMA-FLEX 

units use R-410A refrigerant to reduce operating costs, and contribute to a significant 

reduction of CO

emissions. We are ecofriendly and strive to make green quality products. 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

1.2.  INSTALLATION DIAGRAM 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

2.  NOMENCLATURE 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

3.  ELECTRICAL DIAGRAMS 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

10 

 

 

 

 

4.  DIMENSIONES 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

11 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

12 

 

5.  INSTALLATION AND UNIT STARTUP 

/!

WARNING /!

\

 

 

LOCATION 

To keep warranty this unit must be 

installed by trained personnel with 

expertise on water chillers installation. 

 

Some  of  the  voltages  on  the  unit  may 
be  dangerous,  before  servicing  it  is 
recommended  to  totally  de-energize 
the unit. 

 

CLIC  Units 

are  designed  to  be  installed  outdoors. 

It  is  necessary  that  the  unit  has  air  venting,  and  a 
free  air  intake  (see  Fig  1)  to  allow  for  good  air 
circulation and allow access for maintenance. 
 
For  fully  functioning, 

CLIC

  units  only  require  the 

connection  with  the  hydraulic  local  net  and  power 
supply  connection  in  accordance  with  technical 
data sheet.  
 

Note: 

For  optimal  operation  if  the 

CLIC

  unit  is 

installed  in  a  machinery  room,  it  should  be  at  a 
maximum temperature of 95 °F (35 °C)  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

13 

 

5.1.  INSTALATION 

The following items must be checked before the unit´s startup.  

DATE: 

 

JOB SITE: 

 

LOCATION: 

 

CONTRACTOR: 

 

TECHNICIAN / COMPANY THAT 

PERFORMS STARTUP: 

 

UNIT MODEL: 

 

UNIT SERIAL: 

 

The following procedures are to be considered by the installer; personnel must be qualified and 

certified to perform installation in order to comply all specifications and good practices to assure the 

correct unit´s operation.

 

 

1.- PHYSICAL INSPECTION (BEFORE ELECTRICAL CONECTION) 

 

● Check unit for possible transportation or handling damage.  

 

● Visual check for refrigerant leaks. 

 

● Only Open unit to install system piping. Do not remove connection´s protection until hydraulic circuit is 
to be closed. 

 

● Check for foreign objects in fan discharge. 

 

● Check pulley alignment and band tension. 

 

● Check that air intake is not obstructed, and has the required space  suggested on Fig. 1  

 

 

2.- HYDRAULIC CIRCUIT INSPECTION 

Water  connections  are  NPT  type  inner  thread  (to  identify  the 

connection  diameter,  see  unit’s 

data  sheet).  Installation  of  a  water  filter  is  necessary  on  all  hydraulic  circuits  in  order  to  avoid 
solid particles  in  it,  which  must be installed  on the return side of the circuit,  and cleaned  once 
the system´s initial charge is finished. 

● Check water filter to be clean. 

 

● Verify that all service valves are open. 

 

● Check for adequate makeup water supply. 

 

● Verify that all piping is filled with water and air has been vented out. 

 

● Check Thermometers. 

 

● Check Manometers. 

 

Note: 

Accessories such as Thermometers, manometers, measuring ports, etc. are recommended 

but not necessary for the unit´s operation. 

/!

WARNING /!

 If hydraulic circuit contains air, it may compromise the units operation.

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

14 

 

5.1.1.  ELECTRICAL SUPPLY INSPECTION 

The  electrical  piping  is 

nipple  NPT  threaded  conduit  (1”  inch  diameter  on  all  models)  the  units 

require 3 phase grounded electrical power.  

● 

Verify that the thermo-magnetic switch is of correct capacity for the unit. 

 

● 

Check that all electrical connections are tight. 

 

● 

Check for false contacts on ground, and all wiring. 

 

● 

Check internal connections for control and power. 

 

● 

Measure voltage on all lines, and ground, neutral, and TF line. 

 

● 

Check for overload protection on motors to be in position to design requirements, 

and on automatic mode. 

 

● 

Check voltage monitor control (*Motor Saver), to be adjusted to supply the correct 

power voltage for the unit. 

 

 

Note: 

The unit´s control panel has a ventilation duct, and it must not be obstructed in any manner. 

 
 
 

 

 
*The  unbalance  percentage  of  electrical  supply 
should  be  calculated  with  the  following  formula  and 
adjusted on the UNBALANCE TRIP knob. 

UNBALANCE PORCENTAGE = [(MAXIM 

AVERAGE DEVIATION)/(AVERAGE)]X[100] 

Note: 

CLIMA-FLEX  units  are  previously  factory 

adjusted  however the electrical supply may  vary  on 
each installation, and due to this unbalance must be 
adjusted  before  startup  in  order  to  protect  all  the 
unit´s motors and electrical components. 
 

DIAGNOSIS INDICATING LIGHTS 

(LED STATUS)

 

NORMAL 
OPERATION 

CONSTANT  GREEN 

START DELAY 

INTEMITENT GREEN 

INVERTED 
PHASE 

INTERMITENT RED 

PHASE 
UNBALANCED 

RED ON LAPSES 

HIGH / LOW 
VOLTAGE 

CONSTANT RED 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

15 

 

 

5.1.2.  CONTROL PANEL INSPECTION  

 

● 

Check the control panel to ensure that it is free of foreign objects. 

 

● 

Energize the unit with 3 phase electrical power. Phase unbalance must less than 

2% of average. 

 

● 

Cycle each fan to assure rotation is correct  

 

● 

Cycle water pump (if applicable) to ensure that it is correctly energized. 

 

 

 

¡CAUTION! 

CLIC

* units are equipped with scroll compressors which must rotate freely or mayor damage to the 

compressor may happen. Check rotation previously. 

 

5.2.  STARTUP 

 
After finishing the inspection of the previous installation points and making sure all 

the unit’s items 

are correct the unit may be started. 
 

1.  UNIT CONTROL  

Set the UNIT CONTROL switch on the ON position (Fig 2) to energize the control panel with 24 
Volts. 

After energizing the controller, wait five minutes for the unit to be on line and ready. 

2.  ON/OFF 

Operation sequence will initiate by checking all security pre-programed points on the unit. If all 
required conditions are OK the unit will be ready to initiate operation. 

To start operation set the ON/OFF switch (Fig 2) to the ON position. 

After six seconds the controller will command the start of the water pump.  

If water flow is detected on the pipes, the internal sequence of the unit will begin. 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

16 

 

6.  COMPRESSORS 

Set the APG1 switch, 24V (Fig. 2) to the ON position afterwards set the APG2 switch also to the 
ON  position,  finally  set the  APG3  (Reset)  switch  to  ON,  this  will  enable  the  compressors  start 
cycle. 

Note:

 The APG4 switch (Fig. 3) selects the unit´s operating mode, whether is it cooling only or 

heat pump. If you wish to operate the unit as heat pump turn this switch to ON.  

Fig.2 Cooling Only Mode

 

 

frío o bomba de calor. Si desea que funcione en modo bomba de calor active el apagador. 

 

 

 

Fig. 3 Heat-Pump Mode 

 

 

Compressor 

24V 

Reset 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

17 

 

 

 

CLIC SERIES 

MAINTENANCE 

MANUAL 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

18 

 

1. 

MAINTENANCE 

 

1.1 

HYDRAULIC MAINTENANCE 

 

 

Monthly  Trimonthly  Semester 

Yearly 

Hydraulic filters cleaning (if present) 

 

 

 

 

Visual Inspection of all pipes for leak detection. 

 

 

 

 

Replenish Water on hydraulic circuit. 

 

 

 

 

Verify that there is no air on the water pipes 

 

 

 

 

Verify the air purge valve (must be clean and in  
working order) 

 

 

 

 

 

1.2 

ELECTRICAL MAINTENANCE 

 

 

Monthly 

Trimonthly  Semester 

Yearly 

Check all electrical connections, power, and control 
panels. 

 

 

 

 

Physical inspection of all relays, and starters on the 
electrical panel. 

 

 

 

 

Check amperage on all motors, and compare them 
to plate values.  

 

 

 

 

Physically check for false contacts. 

 

 

 

 

Verify status of all electrical protections to be under 
the manufacturer specifications. 

 

 

 

 

Clean the electrical panels. 

 

 

 

 

Very that the power line connectors are clean and 
tight at the main power switch and at the 
compressor. 

 

 

 

 

 

1.3 

PHYSICAL INSPECTION 

 

 

Monthly  Trimonthly  Semester 

Yearly 

Condenser cleaning with pressurized clean water, 
interval depends on ambient conditions. 

 

 

 

 

Check refrigerant load (3 months period). 

 

 

 

 

Change fan motor bearings as necessary. 

 

 

 

 

Verify electrical power consumption on compressors, 
to determine refrigerant leaks. 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

19 

 

 

 

 

 

CLIC SERIES 

CONNECTION MANUAL 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

20 

 

1.   HYDRAULIC CONNECTION 

 

1.1   NIPPLE CONNECTION 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 

Align the units flush side by side to 

begin the installation.

 

Install the O-rings on the 

connections rods.

 

The connection rods have to be 

installed inside the unit, when 

properly aligned the O-rings will 

seal the nipple connections. 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

21 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Ranura para el 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Indentation for the O-ring 

Make sure that the O-rings are 

evenly distributed along both ends 

of the pipe.

 

Install the couplings covering the 

O-rings. 

 

Note:

 The couplings should make a 

perfect fit around the O-rings.

 

Tightly close and adjust the 

couplings using nuts and bolts (½ 

inch).

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

22 

 

1.2     CONNECTION ROD INSTALLATION 

 

 

 

 

 

 

 

 

Install the O-rings on the 

connections rods.

 

Install the connection rods on the 

cold water distribution system. 

Make sure that the O-rings make a 

perfect water proof seal.

 

Install the couplings covering the 

O-rings. 

 

Note:

 The couplings should make a 

perfect fit around the O-rings.

 

Tightly close and adjust the 

couplings using nuts and bolts (½ 

inch).

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

23 

 

 

 

 

 

Note:

 Vitaulic ends have to be installed on the cold water in and out ports on the side that will not 

be in use.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

REV. 2015-SEP-13 

Clima-Flex S.A. de C.V. 

 

24 

 

 

1.3    HYDRAULIC CONNECTION DIAGRAM