PDF User Manual

  1. Home
  2. Manuals
  3. Clenergy PV-ezRack SolarTerrace III Planning And Installation Manual

Clenergy PV-ezRack SolarTerrace III Planning And Installation Manual

Made by: Clenergy
Type: Planning And Installation Guide
Category: Solar panel
Pages: 11
Size: 1.23 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

 

PV-ezRack

®

 

SolarTerrace III

 

Planning and Installation Guide 

Complying with AS/NZS1170.2:2011 

 

 

 
 
 

Contents 

Introduction 

 

 

 

 

 

 

 

Installation Tools & Components 

 

 

 

 

Installation Guide  

 

 

 

 

 

 

Service 

 

 

 

 

 

 

 

 

11 

1.

 

Introduction  

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

Clenergy  PV-ezRack

®

  SolarTerrace  III™  is  a  pre-assembled  ground  mount 

system  suitable  for  large  scale  commercial  and  utility  scale  installations.  PV-
ezRack  SolarTerrace  III  has  been  developed  to  fit  any  PV  module.  The 
innovative  and  patented  SolarTerrace  III™  T-Rails  simplify  and  improve  the 
accuracy  of  the  installation.  Using  high  quality  engineered  components 
SolarTerrace  III

®

™  saves  developers  and  installers,  time  and  money  when 

delivering large scale projects. 
 
Please  review  this  manual  thoroughly  before  installing  your  SolarTerrace  III™ 
system.  This manual provides (1) supporting documentation for building permit 
applications  relating  to  PV-ezRack  SolarTerrace  III  Mounting  system,  and  (2) 
planning and installation instructions for SolarTerrace III. 
 
SolarTerrace  III™  parts,  when  installed  in  accordance  with  this  guide,  will  be 
structurally  adequate  and  will  meet  the  AS/NZS  1170  standards.  During  the 
installation  and  especially  when  working  on  the  roof  inform  yourself  about  the 
appropriate  safety  regulations,  and  please  also  pay  attention  to  the  relevant 
regulations  of  your  local  region.    Please  check  that  you  are  using  the  current 
version of the installation manual by contacting Clenergy Australia by email on 
sales@clenergy.com.au, or your local representative. 

 
The installer is solely responsible for: 

 

Complying  with  all  applicable  local  or  national  building  codes,  including 
any that may supersede this manual; 

 

Ensuring  that  PV-ezRack  and  other  products  are  appropriate  for  the 
particular installation and the installation environment; 

 

Using  only  PV-ezRack  parts  and  installer-supplied  parts  as  specified  by 
PV-ezRack (substitution of parts may void the warranty and invalidate the 
letter of certification on page 2); 

 

How to recycle: according to the local relative statute. 

 

How to disassemble: Reverse installation process.   

 

Ensure that there are no less than two professionals working on panel 
installation.   

 

Ensure the installation of relative electrical equipment is performed by 
professional electrician.  

 

Ensuring safe installation of all electrical aspects of the PV array. 

2.

 

Installation Tools & Components 

2.1 Installation Tools 

 

Allen Key  

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

 

Power Tool  

 

Adjustable Spanner 

 

String  

2.2 Component List 

Overview of system components 

 

 

 

 

End Clamp 

Inter Clamp 

T-Rail 

Rail Clamp 

 

 

Splice for T 

Rail 

Assembly 

Support  

 
2.3 System Components 

 

1)

 

End Clamp 

2)

 

Inter Clamp 

3)

 

T Rail 

4)

 

Rail Clamp 

5)

 

BackBase 

6)

 

Front Base 

7)

 

T Rail Splice 

8)

 

Truss support 

 

 

 

 

 

 

 

 

 

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

2.4

 

Installation Planning 

 

Clenergy PV-ezRack SolarTerrace III is compatible for panels up to 1800mm long. 

 

Design for panels 1800mm long

 

Design for panels 1580mm long 

 

 
 
Minimum spacing between 2 legs: 

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

 

STIII Panels Up To 1.80m 

 

 

 

 

Wind Zone 

Region A 

Region B 

Region C 

Region D 

Wind Speed(m/s) 

41 

48 

56 

66 

Leg Spacing(m) 

3100 

2800 

2200 

1500 

Footing design: 

 

We  recommend  using  M10  Grade  5.8  Carbon  Steel  anchor  studs  with  Ramset 
Chemset  REO502  chemical  injection  anchoring  system.  Minimum  anchor 
embedment  depth  of  90mm  with  concrete  strength  of  25MPa.  For  concrete 
specifications see STIII engineering certificate. 
 

L  

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

 


background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: sales@clenergy.com.au 

 

 

3.

 

Installation Process 
 

3.1 Installing the single Truss Support 

3.1.1 Unfold the folded 

Truss support then Bolt the 
enforcement tube to the 

bottom of the back leg. 

Fasten the bolts and nuts 
pre-assembled to secure the 

structure. 

 

 

3.1.2 Connect the front and 

rear legs to the bolts pre-

installed on the ground or 
screw the legs using anchor 

screws. 

 

3.1.3 Make sure the other 
connections on the 

components are tighten.

 

 

 


background image

 

 

PV-ezRack Solar Terrace III_Planing and Installation Guide_V1.2 (Rev 1) 

Page 8 of 11

 

 

18/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: sales@clenergy.com.au 

3.1.4 According to the 

planning, repeat the above 

operation. 
Note that the all Tri-Groove 

Beam must be in the same 

line. 
 

 

 
3.2 Installing the T Rails 

3.2.1 Before installing the 

T Rails, mark the position of 
the rails on the beam. 

Note: Clenergy will 

preassemble the bottom rail 
clamp when supplying the 

product for large projects. 

 

3.2.2 Before installing the T 

Rails to the Tri-groove 

beam, make sure the rail is 
long enough, otherwise 

connect the T rails using T 

rail splice.  
 

It’s recommended to  
connect the rails before 

installing them on the 

Tri-groove Beam

 

 

 


background image

 

 

PV-ezRack Solar Terrace III_Planing and Installation Guide_V1.2 (Rev 1) 

Page 9 of 11

 

 

18/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: sales@clenergy.com.au 

3.2.3 Install the rails 

according to 3.2.1. 

 

 

3.2.3 Mark the panel  
array perimeter and 

attach T Rail to Tri- 

groove Beam with one 
T Rail Clamp on each side.    

 

3.2.4 Install the other rails. 

Note: The end of the rails 

must line up. 

 

 

 
 

 

 
 

 

 
 

 
 

 

 
 

 

 
 

 

 
 

 

 


background image

 

 

PV-ezRack Solar Terrace III_Planing and Installation Guide_V1.2 (Rev 1) 

Page 10 of 11

 

 

18/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: sales@clenergy.com.au 

3.3 Installating PV panels 

3.3.1 Install the panels by 
using patented Clenergy 

End Clamps and Inter 

Clamps. Clenergy 
recommends 750-1000mm 

rail overhang at the end of 

the array. It can be 
maximum 50% of the 

spacing between the STIII 

supports.  

         

 

3.3.2 Install the second row 

of panels making sure to 
leave an 18mm gap 

between the two rows.   

 

3.3.3 Now the installation is 
completed. 

 

 
 

 


background image

 

 

PV-ezRack Solar Terrace III_Planing and Installation Guide_V1.2 (Rev 1) 

Page 11 of 11

 

 

18/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: sales@clenergy.com.au 

 
 

10 Years Standard Warranty Terms and Conditions 
20 Year Designed Service Life 

 
Clenergy  international  co.  Ltd  warrants  to  the  original  purchaser  (“Purchaser”)  of 

product(s)  that  it  manufactures  (“Product”)  at  the  original  installation  site  that  the 
Product shall be free from defects in material and workmanship for a period of ten (10) 

years, except for the anodised finish, which finish shall be free from visible peeling, or 

cracking or chalking under normal atmospheric conditions for a period of five (5) years, 
from  the  earlier  of  1)  the  date  the  installation  of  the  Product  is  completed,  or  2)  30 

days after the purchase of the Product by the original Purchaser (“Finish Warranty”). 
The Finish Warranty does not apply to any foreign residue deposited on the finish. All 

installations  in  corrosive  atmospheric  conditions  are  excluded.  The  Finish  Warranty  is 

VOID if the practices specified by AAMA 609 & 610-02 – “Cleaning and Maintenance for 
Architecturally Finished Aluminium” (www.aamanet.org) are not followed by Purchaser. 

This Warranty does not cover damage to the Product that occurs during its shipment, 
storage, or installation. 

This  Warranty  shall  be  VOID  if  installation  of  the  Product  is  not  performed  in 

accordance with Clenergy’s written installation instructions, or if the Product has been 
modified, repaired, or reworked in a manner not previously authorized by Clenergy IN 

WRITING, or if the Product is installed in an environment for which it was not designed. 
Clenergy shall not be liable for consequential, contingent or incidental damages arising 

out of the use of the Product by Purchaser under any circumstances.  

If within the specified Warranty periods the Product shall be reasonably proven to  be 
defective,  then  Clenergy  shall  repair  or  replace  the  defective  Product,  or  any  part 

thereof,  in  Clenergy’s  sole  discretion.  Such  repair  or  replacement  shall  completely 
satisfy  and  discharge  all  of  Clenergy’s  liability  with  respect  to  this  limited  Warranty. 

Under  no  circumstances  shall  Clenergy  be  liable  for  special,  indirect  or  consequential 
damages arising out of or related to use by Purchaser of the Product. 

Manufacturers of related items, such as PV modules and flashings, may provide written 

warranties  of  their  own.  Clenergy’s  limited  Warranty  covers  only  its  Product,  and  not 
any related items.