PDF User Manual

  1. Home
  2. Manuals
  3. CN 80 User Manual

CN 80 User Manual

120

Made by: CN
Type: User Manual
Category: Boiler
Pages: 21
Size: 1.57 MB

 

Download PDF User Manual



Full Text Searchable PDF User Manual



background image

Page  1

 

 
 
 

User Manual 

 

for CN Boilers 

 

Type 

 

80 / 120 

 
 

 

              Machine no.    

 

 

 
                         Date 

 
 

CN Maskinfabrik A/S

 

   Skovløkkevej 4, Tiset 
   6510 Gram, Denmark 

Tel.: 74 82 19 19  
Fax: 74 82 19 20                                                                        Version: April 2005 

 

 

 

 

 


background image

Page  2

CONTENTS

 

 
Page 1.    Front page 
Page 2.    Contents 
Page 3.    Function 
Page 4.    Dimensions 
Page 5.    Rating plate / Boiler with Cooling Spiral / Responsibilities / Safety  
Page 5.    Startup, Manual Stoking 
Page 6.    Installation and Assembly Guide 
Page 7.    Installation and Assembly Guide 
Page 8.    Installation and Assembly Guide 
Page 9.    Installation and Assembly Guide 
Page 10.  Maintenance, Cleaning and Frost Protection 
Page 11.  Technical Information. / Warranty Claims 
Page 12.  Check List, End User 
Page 13.  Check List, Supplier 
Page 14.  Check List, CN MASKINFABRIK A/S. 
Page 15.  Warranty Certificate, Customer Copy 
Page16.   5 Year Warranty Certificate CN MASKINFABRIK A/S. 
Page 17. Principle Diagram Overflow Valve / Cooling Spiral 
Page 18. Principle Diagram Open Expansion with Accumulation Tank. 
Page 19. Principle Diagram Pressure Expansion Without Accumulation Tank 
Page 20. Principle Diagram Open Expansion Without Accumulation Tank. 
Page 21. Principle Diagram Open Expansion Without Accumulation Tank. 
 
 

 

Accessories supplied with the boiler 

 

1. Probe (dip pipe, valve, sensor) 
2. Cleaning brush 

3. 

Scraping tool

 

 
 

 

 
 
 
 
 

 


background image

Page  3

 
 

All CN boilers must be installed according to the Installation and Assembly 
Guide below.   
If the boiler is not installed in accordance with the installation instructions in the 
user manual, it is the responsibility of the installation engineer to submit the 
boiler unit to a construction test (module B1) or install the boiler unit in 
accordance with a system of full quality assurance (module H) according to the 
Pressure Equipment Directive 97/23/EEC. In both cases, an authorised body after 
your own choice must be contacted. 

 

Function 

 

The CN boiler is a triple-flue boiler constructed on the basis of many years’ experience and testing. 

 

The CN boiler is constructed with a large cylindrical fire chamber, specially developed for firing with 
stoker, wood, wood chips, saw dust, peat, paper, coal or coke etc. 

 

The convection part of the CN boiler is placed on top of the fire box in the hottest part of the boiler, 
which consists of many smoke gas sections surrounded by water. 

 

The construction and dimensions of the CN boiler thus create an efficient use of the smoke gas 
before it reaches the smoke outlet 

 

The large doors of the CN boiler, which open both the fire chamber and the smoke ducts, make 
cleaning the boiler very efficient and easy. 

 

Optimal, environmentally friendly and highly efficient burning of the wood requires correct ratio 
between the combustion air and the smoke gasses from the fuel. 

 

The boiler is constructed with a large door to enable the burning of large objects. 

 

Acidifying substances such as plastic (PVC) must not be burned in the boiler, as they produce 
hydrochloric acid fumes during combustion (HCL). 

 

Basifying substances must not be burned in the boiler, as they corrode the boiler during combustion. 

 

It is important that the feeding of fuel is adjusted to allow the heat from the wood to be contained in 
the heat reservoir at all times. The stoking should be adjusted so that the fuel has just been burned 
when the heat reservoir reaches its maximum temperature.

 

 

The boiler efficiency is larger when the boiler can deliver the heat without having to shut off the air 
supply too much. 

 

 


background image

Page  4

 

 
 

Key   

 

CN 80  CN 120 

 

mm 

1700 

1780 

 

mm 

1540 

1540 

 

mm 

1800 

1800 

 

mm 

2130 

2130 

Return pipe 

mm 

2” 

2” 

Smoke outlet 

mm 

250 

250 

 

mm 

300 

310 

 

mm 

1400 

1480 

 

mm 

980 

1180 

Supply / Return 

inches 

2” 

2” 

Expansion vessel  inches 

1” 

1” 

Flue regulator 

inches 

1” 

1” 

 

Yield wood 

kW

 

65 

100 

Yield automatic stoking 

kW

 

80 

120 

Heat surface 

m2 

7.5 

9.6 

Volume fire chamber 

m2 

0.75 

1.07 

Test pressure 

bar 

Water content 

litre 

490 

560 

Fire box diameter 

mm 

815 

970 

Fire box depth 

mm 

1450 

1450 

Smoke tube stub 

diameter 

mm 

250 

250 

 
 
 
 
 
 

 


background image

Page  5

 

 
 
 
 
Boiler type 

 

Production year 

 
 

Serial no. 

 

Yield 

 

Max. op. temperature                                                                    

 

Test pressure 

            

                                                                                                                     

 

Oper. pressure 

 
 

 
 

Boiler with cooling spiral 

Boilers can be ordered with a cooling spiral, and this must be used for installation with pressure expansion, 
and in open systems if the pressure in the boiler is above 0.5 bar over pressure.  
The cooling spiral must only be used as a cooling spiral; it must not be used for heating up water for other 
use. Therefore the cooling spiral must be left empty during operation. Water supply for cooling spiral 
maximum 15 °C. Pressure for cooling spiral minimum 2 bar, maximum 10 bar. 

 

Responsibilities 

The user is responsible for the operation of the boiler and ensuring compliance with the operational 
guidelines supplied by CN MASKINFABRIK A/S. Failure to comply with the guidelines may result in reduced 
efficiency and increased negative effects on the environment, as the boiler will not achieve as clean emission 
gasses as intended. Furthermore, incorrect operation can reduce the working life of the boiler. 
Correct operation and installation are the best guarantees for a well-functioning boiler with a long life and a 
good environment. The user needs to have the necessary willingness and correct attitude to burning wood, 
as it does, after all, take a bit of work to ”yield the crops” of this environmentally friendly and financially 
profitable type of heating 

 

Safety 

If any faults or failures are found, they must be repaired as soon as possible by a boiler engineer. Flue pipes, 
ventilation ducts, air holes etc. must not be closed off or blocked. Flammable liquids or combustible 
substances must not be placed in dangerous proximity to the boiler. 
For systems with an operational pressure above 0.5 bar over pressure (closed system with pressure 
expansion or open system where the height from the boiler to the highest water surface is more than 5 
meter), the boiler must be equipped with a cooling spiral connected to a cold water supply.  
Boilers equipped with a cooling spiral must not be used (should be switched off) if the water supply is out of 
order, or the water supply to the boiler is shut off (e.g. on the main tap). 

 
 

Startup, manual stoking 

1.  Fill the boiler with the required amount of combustible material. 
2.  Light the fuel from below. 
3.  Adjust the air supply hatches (only until the right air supply level is found) only during manual stoking 

without stoker. 

 

Note.

 Be very careful when opening the door to the boiler during operation due to extreme heat 

inside the boiler and smoke emission. 

Stop: 

When the fuel material has been burned, the heat supply from the boiler stops. 

 
 
 

 

 


background image

Page  6

Installation and Assembly Guide: 

 

Norms and Directions 

 

It is the responsibility of the installation engineer that he has the necessary training and authorisation 
to install the boiler. The size of the boiler should be based on the heating needs of the house rather 
than the size of the fuel container. 

The installation must fulfill the requirements described in the directions of the

 

Health and Safety at 

Work Act 1974, iincluding the following regulations: The Electricity at work Regs 1989, The Provision 
and Use of Work Equipment Regs 1998, The Personal Protective Equipment Regs 1992, 
The Fire Precautions (Workplace) (Amendments) Regs 1999, The construction Design and 
Management Regs 1994. Current Institute of Electrical Engineers regulations. “The Pressure 
Equipment Directive 97/23/EEC” and UK Building Regulations 2000 (as amended). See in particular 
the following approved documents: 
A: structure 2004 + amendments 
B: fire safety 2000 edition + amendments 
F: ventilation 2006 edition 
J: combustion appliances and fuel storage systems 2002 edition 
J: Guidance and supplementary information on the UK implementation of European standards for 
chimneys and flues 2002 edition 
L1A; L1B; L2A;L2B: Conservation of fuel and power 2006 edition. 
M: Access to and use of buildings 2004 edition 
P: Electrical Safety – Dwellings – 2006 edition 

 

If the boiler is used for burning straw, the installation must furthermore fulfill the requirements 
described in the specific directions of The Health and Safety at Work Act 1974

 

 

All smoke pipes must have an uphill gradient of minimum 1 %, and all joints must be tight. Never use 
a smaller diameter smoke pipe as the boiler outlet pipe. Always use elbows with a bending and flap as 
bent joints, as they provide the best flue. 

All smoke pipes must be insulated, also when the boiler 

is used with stoker feeding.  

 

The combustion must not be carried out until the boiler is installed and fully connected. 

 

A probe must always be installed on the boiler, and the return pipe (pages 9/11) must always be 
minimum 60° C during operation. See the assembly guide drawing. 

 

If the right physical conditions are present, the boiler may be installed on a base (approximately 
400 mm high) to make the operation and removal of ashes easier.  

 

Open or closed system 

 

CN boilers type 80 and type 120 are approved for installation as open or closed systems.  

 

When used as a closed system (with pressure expansion) and open system with a height above 5 
meters, the boiler must be equipped with a cooling spiral and a thermal over temperature valve 
(pages 7 & 8). 

 

Safety valve requirements in closed systems 

 
 

 

With boilers > 60 kW every boiler must have at least 2 safety valves. The safety valves must be able 
to, in combination at the chosen blow-off pressure, blow off at least 1.5 times the boiler heat yield in 
the form of steam. They must, however, have a minimum internal diameter of 20 mm. 

 

The inlet and outlet hoses of the safety valves must be of sufficient dimensions for the capacity of the 
safety valves not to be noticeably reduced. The inlet pipe must not contain blocking devices, pumps, 
boiler mountings, restrictions or water sacks.  

 

All inlet and outlet hoses to and from safety valves must be run through pipes approved for 120 °C 
and minimum 10 bar over pressure. 

 
 
 
 
 
 
 

 


background image

Page  7

Safety hose open systems (open expansion) 

 

 

All the system boilers must have a connection to the atmosphere through a safety hose which cannot 
be blocked. 

 

Safety hoses must depart from the top of the system boiler(s). They must run at an uphill gradient to 
the open expansion vessel and from there run at a steady downhill gradient, at a suitable distance 
from a drain and in such a way that the outlet of hot water does not result in a risk of injury. The outlet 
point must be cut at an angle. 

 

At the highest point of the safety hose there must be an internal diameter of minimum 15 mm as a 
siphon break. 

 

The vertical distance from the highest point of the system to the boiler must not exceed 10 meters. 

 

The total length of the safety hose must not exceed 20 meters. 

 

For boilers > 60 kW the safety hose must have a minimum internal diameter of 35.5 mm 

 

All pipes must be approved for 120 °C and minimum 10 bar over pressure. 

 
 

For installation with operational pressure >0.5 bar and open expansion principle diagram pages 

17 & 20 must be used 

 

 

If the operational pressure of the boiler exceeds 0.5 bar over pressure, the boiler unit (the installed 
boiler including fittings and safety equipment) is covered by the Pressure Equipment Directive 
97/23/EEC ”Installation of pressurised equipment”, which requires that the boiler unit must fulfil 
certain essential safety requirements regarding the safety equipment of the boiler etc. 

The boiler 

must be fitted with a cooling spiral

  

 

 

 

 

 

 

Expansion vessel

: The vessel must be installed in accordance with the directions of The Health and 

Safety at Work Act 1974. 

 

The bottom of the expansion vessel should be installed only above pipes/radiator of the central 
heating system and with an open expansion vessel. Block valves must under no circumstances be 
placed between the boiler and the expansion vessel. 

There must under no circumstances be any 

circulation in the expansion vessel.

 

 
The boiler must be installed with pos. nos. 1, 2, 3, 4, 5, 7, 9, 10, 13 (drawings pages 17 & 20) 

 
Description 

Type / Requirements 

Draw. Pos no.   Supplier 

Shunt valve 

TA type TRV 300 

CN (supplied) 

Oper. thermostat 

BC components type NTC-2322 

CN (supplied with stoker) 

Overheat. thermostat 

Honeywell type L6188 

CN (supplied with stoker) 

Boiler thermometer 

0-120 degrees 

Installation engineer 

Pressure gauge 
(manometer) 

0-3 maximum 5 bar, red mark at 2.5 bar 

Installation engineer 

Expansion vessel 

CE labeled, minimum 8 % of total system 
water volume  

Installation engineer 

Safety valve  
CE approved 

2 pces., 2.5 bar, clearance minimum 20 mm 
 

 

Installation engineer 
 

Cooling spiral 
CN80: 

 
Wieland heat exchanger type WRK 13 

 

CN (supplied) 

Cooling spiral 
CN120: 

 
Wieland heat exchanger type WRK 13 

 

 

Safety thermostat 

Honeywell type TS130, CE approved 

10 

CN  

Water shortage protection  RT 200 Pressostat 

13 

Installation engineer 
  

 
 
 
 
 
 
 

 


background image

Page  8

For installation with operational pressure >0.5 bar and pressure expansion, principle diagram pages 

17 & 19 must be used  

 

  If the operational pressure of the vessel exceeds 0.5 bar over pressure, the boiler unit (the installed 

boiler including fittings and safety equipment) is covered by the Pressure Equipment Directive 
97/23/EEC ”Installation of pressurised equipment”, which requires that the boiler unit must fulfill 
certain essential safety requirements regarding the safety equipment of the boiler etc. 

The boiler 

must be fitted with a cooling spiral amongst other things

  

 
The boiler including fittings and safety equipment must be installed in accordance with the principle diagrams 
on pages 17 and 19. The engineer must test the safety equipment in accordance with the section "Testing 
the safety equipment" before the system is handed over to the user. The following fittings and safety 
equipment etc. must, in accordance with the above-mentioned principle diagrams, be installed in the boiler 
unit in order to be covered by the CN Maskinfabrik A/S Construction Test Certificate: 

 
The boiler must be installed with pos. nos. 1, 2, 3, 4, 6, 7, 9, 10, 13 (drawings pages 17 & 19)

 

Description 

Type / Requirements 

Draw. Pos 
nos.  

Supplier 

Shunt valve 

TA type TRV 300 

CN (supplied) 

Oper. thermostat 

BS components type NTC-2322 

CN (supplied with stoker) 

Overheating thermostat 

Honeywell type L6188 

CN (supplied with stoker) 

Boiler thermometer 

0-120 degrees 

Installation engineer 

Pressure gauge 
(manometer) 

0-3 maximum 5 bar, red marks at 2.5 bar 

Installation engineer 

Pressure expansion 
vessel 

CE labeled minimum 4 % of total system 
water volume (see table below) 

Installation engineer 

Safety valve  
CE approved 

2 pces., 2.5 bar, clearance minimum 20 
mm 
 

 

Installation engineer 
 

Cooling spiral 
CN 80: 
CN120: 

 
Wieland heat exchanger type WRK 13 
Wieland heat exchanger  type WRK 13 

 


CN (supplied) 

Safety thermostat 

Honeywell type TS130, CE approved 

10 

CN (supplied with stoker) 

Water shortage protection  RT 200 Pressostat 

13 

Installation engineer 

 
 
NOTE: 

 

The system must have a membrane type expansion vessel with airbag. The expansion vessel must 
have a durable and solidly fastened rating plate which clearly states Manufacturer, Volume in litres, 
Test Pressure in bar and Initial Pressure in bar 

 

The expansion hose between the expansion vessel and the rest of the system must not be less than 
25mm.

 

 

 

Safety valve

: The safety valve must be installed in accordance with the directions of The Health and 

Safety at Work Act 1974. 

 

Expansion vessel

Expansion vessels

: The vessel must be installed in accordance with the 

directions of The Health and Safety at Work Act 1974. 

 

 

 
 

Size of expansion vessel closed system: 

 

Calculation of pressure expansion 
Water expansion in % from 10 °C                 
 

Average temperature 

°C 

60 

1.7 

70 

2.3 

80 

3.0 

90 

3.6 

100 

4,4 

 


background image

Page  9

110 

5,2 

120 

6,0 

 
 
 

 
 
 
 
Expansion vessel efficiency 

 

Example of calculation (new systems)

 

in % after initial and operational pressure 

 

Oper. pressure bar 

In. 

pres. 

1.0 

1.5 

2.0 

2.5 

0.5 

25 

40 

50 

57 

1.0 

 

20 

33 

42 

1.5 

 

 

16 

28 

2.0 

 

 

 

14 

 

For boilers with open expansion and operational pressure < 0.5 bar, the principle diagram pages 18 & 

21 must be used 

 

If the operational pressure of the boiler is below 0.5 bar, the boiler must be installed in accordance with 
the directions of The Health and Safety at Work Act 1974 about combustion hot water systems. 

Cooling 

spiral is not required

.

 

The bottom of the expansion vessel should be installed above the highest 

pipe/radiator of the central heating system and with an open expansion vessel. Block valves must under 
no circumstances be placed between the boiler and the expansion vessel.

 

There must under no 

circumstances be any circulation in the expansion vessel.

 

 

 

Size of expansion vessel open system: 

The expansion vessel must be at least 8 % of water content (boiler + reservoirs + pipes and radiators) 
acc. to Btv32. 

Boilers exclusively used for manual stoking must be installed with following pos. nos. 1, 4, 5, 11, 12 
(draw. page 18) 
Boilers used with stoker pos. nos. 1, 2, 3, 4, 5 (draw. page 21) 

Description 

Type / Requirements 

Draw. Pos no.   Supplier 

Expansion vessel 

CE labeled, minimum 8 % of total system 
water volume  

Installation engineer 

Oper. thermostat 

BS components type 2322 

CN (supplied with stoker) 

Overheat. thermostat 

Honeywell type L6188 

CN (supplied with stoker) 

Boiler thermometer 

0-120 C° degrees 

Installation engineer 

Pressure gauge 
(manometer) 

0-3 maximum 5 bar, red mark at 2.5 bar 

Installation engineer 

Accumulation tank 
 

Type approved in acc. with ”Declaration on 
Installation of Pressurised Equipment” 

11 

Installation engineer 

Shunt valve 

TA type TRV 300 

CN (supplied) 

Flue regulator 

1” Robust  

12 

Installation engineer 

 

Testing the safety equipment

 

The engineer must test the safety equipment before the unit is handed over to the user. 

 

The engineer must check that the operation thermostat is working. 

 

The engineer must also check the overheating protection. 

 

 

                               

This is done by removing the overheating thermostat from the dip pipe and placing it in boiling water. 
The thermostat should now cut out and the system stop. Reset the thermostat once the temperature 
has fallen, and place it back in the dip pipe. 

 

The engineer must also check that the safety valves open at max 2.5 bar. 

 

The engineer must test the operation of the thermal valve for the cooling spiral. The valve should 
open at a sensor temperature of maximum 95 °C. Remove the sensor from the dip pipe and place it 
in boiling water. Check that water now flows through the cooling spiral. Replace the sensor in the dip 
pipe. 

Maximum system temperature °C 

90 °C 

Water content heating system 
Boiler (type 25) 180 L. 
Installation        350 L. 

530 L. 

Water exp. (530x3,6/100) 

19.08 

Expansion vessel efficiency 

57 % 

Size expansion vessel 
(19.08x100/57)=33.47= 

 

34 L. 

 


background image

Page  10

 

 

When installing Water shortage protection Type RT 200 Pressostat, the installation engineer must 
adjust the pressostat so that it stops the system, when the operational pressure is below 0.5 bar over 
pressure. Furthermore, the installation engineer must test that the pressostat physically stops the 
system when the operational pressure < 0.5. This is done by filling the system to more than 0.5 bar 
over pressure, starting the system and shut off the water supply until the system stops; this should 
happen at 0.5 bar over pressure.

 

 

 

Maintenance and cleaning: 

 
 

 

The closing mechanisms of the door and cleaning hatch are adjusted from the factory but must be 
inspected for correct sealing after a month of use, when the gasket has ”settled”. 

 

 

 

If any irregularities are found in the safety valve(s), expansion vessel or automatics of the unit, the 
owner/user must immediately have the equipment in question inspected and repaired by an 
authorised engineer. The owner/user must ensure that any installed safety valves are not blocked by 
scale etc. It is the responsibility of the owner/user that the boiler and any equipment is cleaned and 
maintained according to: 

 

Normal practice,

 

 

The boiler flue system is cleaned by opening the top hatch of the boiler. The many flue pipes placed 
at the top of the boiler should be cleaned every 3 days with the round cleaning brush/cleaning tool 
supplied with the boiler. Push the brush all the way through; take care not to damage the bottom tile 
in the smoke box. Pull the brush / cleaning tool back out; repeat several times for each pipe. After 
cleaning, empty the smoke box at the back of the boiler. The boiler must always be switched off 
during cleaning. Clean smoke pipes and smoke box result in more economical operation. 

 

The boiler combustion chamber should be cleaned every 24 hours (of use). 

 

If the boiler is switched off for a long period (approximately 1 week), the boiler and flue pipes should 
be cleaned thoroughly, as the residue combined with damp results in corrosion

 

The pump(s) must be switched off whilst the system is filled up with water 

 

NOTE: Do not fill up an overheated boiler with water. 

 

Installation with pressure expansion: water filling until 1.5-2.0 bar. 

 

Installation with open expansion: water filling until the water runs out of the expansion vessel 
overflow. 

 

Testing the safety valves

: It is the responsibility of the user that the installed safety valves are 

tested twice annually. This is done by pressing or turning the valve test device. By doing this you are 
able to see and hear a bit of water being released and thereby confirm that the valve is operational. 
Damages caused by a blocked safety valve are not covered by the warranty issued by CN 
MASKINFABRIK A/S. 

 

Safety valves are installed in connection with the central heating unit (2.5 bar) and possibly in 
connection with the hot water circuit (6 bar or 10 bar). Please ask your installation engineer if in doubt 
about the location of the valves. 

 

After 300 hours’ operation, nuts and bolts must be tightened and doors adjusted! 

 

Replacing the glass string in doors 

 

 

Open the door. Remove the old gasket, if necessary with a chisel or a screw driver. Clean the gasket 
groove. Push the new gasket into the groove. Put the last end in place when this is about half done, 
and then the rest. Bang the string lightly with a hammer if necessary.   

 

Frost protection: 

 

During normal operation above freezing point there is no need for frost protection. 

 

The central heating unit can be protected with anti-freeze solution. Remember, however, that the hot 
water container, if relevant, is not protected against frost. 

 

When stopping the unit at an ambient temperature below zero, the boiler must be emptied of water. 
This is done by running a hose from the bottom tap of the boiler to a drain in the floor and opening 
the tap. 

 
 

 


background image

Page  11

Technical information CN80 / 120 boiler installed with 80/120 kW CN Stoker 

 

  Smoke gas temperature 80 / 120 boiler at nominal yield with wood pellets: 142 / 

134

 °C

 

  Smoke gas temperature 80 / 120 boiler at 20 % yield with wood pellets: 78 / 83

 °C

 

  Smoke gas mass flow 80 / 120 boiler at nominal yield: 140 / 229 kg/h  

  Smoke gas mass flow  80 / 120 boiler at partial load 20 % yield: 54.8 / 88 kg/h  

  Nominal yield 80 / 120 boiler in nearest whole kW with wood pellets: 82 / 117 

kW

 

  Yield range 80 / 120 boiler 20 % -100 %:16.7-82 / 32-117kW 

  Required flue 80 / 120 boiler 14 Pa  

  Chimney must have an internal diameter of minimum 250mm and be of an 

approved type. 

  The boiler thermostat setting range is 55-85 °C 

  Water content in 80 / 120 boiler: 490 / 560 L. 

  Boiler classification: 3 

  Set point for boiler thermostat: 65 °C 

 

 

 
 

Warranty Claims 

 

CN MASKINFABRIK A/S provides a 24 month warranty for the stoker unit following the 
date of this user manual for the first user. 
The warranty includes materials and manufacturing faults, but not wear on parts, damages 
caused by failure to maintain the unit, incorrect use or overloading. 
Claims will be compensated based on the price of the spare parts or repair, if this is 
cheaper. Labour wages according to an hourly labour rate for normal working hours as 
specified by CN MASKINFABRIK A/S. 
The warranty does not cover transport, freight, consequential damages and operational 
losses. 

This warranty is not valid until CN MASKINFABRIK A/S has received the check list 
on p. 14. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 


background image

Page  12

CHECK LIST 

 
 
 

 

         

User manual received 

 
 

I have received instructions in the use of the boiler, 

 

including what fuel material may be fed to the boiler. 

 

 

 

 
 

I have received instructions in the maintenance of the boiler 

 
 
 
  Boiler type    :     
 
 
   Serial number:     
 
 
  Year                  :     
 
 
  I hereby declare that I have understood the received material. 
 
 
    Name             :  ____________________________________ 
 
  Address        :   ____________________________________ 
 
  Town and post code:   ____________________________________ 
 
   

____________________________________    

   

Signature 

 
 
For: 
 
   

End user 

 
 
 
 
 
 
 
 
 

 
 

 


background image

Page  13

CHECK LIST 

 
 
 

 

          

User manual received 

 
 

I have received instructions in the use of the boiler, 

 

including what fuel material may be fed to the boiler.   

 

 

 
 

I have received instructions in the maintenance of the boiler 

 
 
 
  Boiler type    :     
 
 
   Serial number:     
 
 
  Year                  :     
 
 
  I hereby declare that I have understood the received material. 
 
 
    Name:              ____________________________________ 
 
  Address:           ____________________________________ 
 
  Town and post code:   ____________________________________ 
 
                           ____________________________________    
   

                   Signature 

 
 
 
 
  Please return to: 
 
   

Supplier 

 

 
 
 
 
 
 
 
 

 

 


background image

Page  14

CHECK LIST 

 

 

         

User manual received 

 
 

I have received instructions in the use of the boiler, 

 

including what fuel material may be fed to the boiler. 

 
 

I have received instructions in the maintenance of the boiler 

 
Installation carried out by :_______________________________________________ 
 

__________________________________________ 

Signature 

 

Please check below 

 

The installation was carried out in accordance with the Installation and Assembly Guide in the user 
manual and is thus covered by the CN MASKINFABRIK A/S Construction Test 
Certificate______________ 
 
The installation engineer has subjected the boiler unit to a construction test (module B1) or 
installed the boiler unit in accordance with a full quality assurance system (module H) in 
accordance with the Pressure Equipment Directive 97/23/EEC

.   _____________________   

 
  Boiler type    :     
 
 
   Serial number:     
 
 
  Year                  :     
 

 

I hereby declare that I have understood the received material. 

 
    Name:               ____________________________________ 
 
 

Address:           ____________________________________ 

 
 

Town and post code:__________________________________ 

 
 

                         ____________________________________    

 

 

                Signature 

 
 

Please return to:  CN MASKINFABRIK A/S,  

 

 

Skovløkkevej 4,  

 

 

Tiset 

 

 

 

6510 Gram, 

 

 

 

Denmark 

 

This warranty only comes into force when CN MASKINFABRIK A/S has received this page signed  

 


background image

Page  15

by the customer and the installation engineer

                                                                                           

 

  

 

                             Warranty Certificate                           

(Customer copy) 

 
CN MASKINFABRIK A/S provides a 5 year warranty for penetrating corrosion of 
the boiler if the following points are adhered to. 

 

 

1. 

The warranty certificate on page 14 is signed, returned and complied with 

2. 

All points of the user manual are complied with 

3. 

The unit is serviced minimum once a year by CN MASKINFABRIK A/S or a 

company approved by CN MASKINFABRIK A/S. 

4. 

The check list on page 12 is returned to CN MASKINFABRIK A/S 

5. 

The boiler must a no time have been used for burning grain. 

6. 

The boiler must not be exposed to insufficient maintenance, incorrect use or 

overloading. 

7. 

CN MASKINFABRIK A/S will repair any claims or approve the repair before it 

is carried out according to the choice of CN. 

 

The service includes the following: 

 

  Gaskets inspected and checked. 

  Doors inspected, tightened and adjusted. 

  Boiler cleaned and inspected 

  Installation inspected. 

  Smoke pipe inspected and checked 

  Any fire resistant materials inspected and checked 

  Cleaning tools inspected and checked. 

  The boiler must be cleaned prior to service 

 
 
 
Serial number: ___________ Date:_______________ 
 
Signature: _______________________________ 
 

 


background image

Page  16

 

Warranty Certificate 

 
CN MASKINFABRIK A/S provides a 5 year warranty for penetrating corrosion of 
the boiler if the following points are adhered to. 

 

 

1. 

The warranty certificate on page 14 is signed, returned and complied with 

2. 

All points of the user manual are complied with 

3. 

The unit is serviced minimum once a year by CN MASKINFABRIK A/S or a 
company approved by CN MASKINFABRIK A/S. 

4. 

The check list on page 12 is returned to CN MASKINFABRIK A/S 

5. 

The boiler must a no time have been used for burning grain. 

6. 

The boiler must not be exposed to insufficient maintenance, incorrect use or 
overloading. 

7. 

CN MASKINFABRIK A/S will repair any claims or approve the repair before it 
is carried out according to the choice of CN. 

 

The service includes the following: 

 

  Gaskets inspected and checked. 

  Doors inspected, tightened and adjusted. 

  Boiler cleaned and inspected 

  Installation inspected. 

  Smoke pipe inspected and checked 

  Any fire resistant materials inspected and checked 

  Cleaning tools inspected and checked. 

  The boiler must be cleaned prior to service 

 
 

Please return this page to:  CN MASKINFABRIK A/S 
 

 

     Skovløkkevej 4 Tiset 

 

 

     6510 Gram, Denmark 

Name 

:________________________________ 

Address 

:________________________________ 

Town 

:___________ Post code:__________________ 

Tel.:  

:________________________________      

Serial number: ___________ Date:_______________ 

Signature: __________________________________ 

 

 


background image

Page  17

 


background image

Page  18

M
A

S

K

IN

F

A

B

R

IK

 A

/S

S

k

o

v

k

k

e

v

e

4

T

is

e

t

6

5

1

0

 G

ra

m

T

lf

7

4

 8

2

 1

9

 1

9

M
A

S

K

IN

F

A

B

R

IK

 A

/S

S

k

o

v

k

k

e

v

e

4

T

is

e

t

6

5

1

0

 G

ra

m

T

lf

7

4

 8

2

 1

9

 1

9

C

h

e

c

k

 

v

a

l

v

e

D

r

a

i

n

i

n

g

 

 
 

 


background image

Page  19

M
A

S

K

IN

F

A

B

R

IK

 A

/S

S

k

o

v

k

k

e

v

e

4

T

is

e

t

6

5

1

0

 G

ra

m

T

lf

7

4

 8

2

 1

9

 1

9

T

h

is

 d
r

a

w

in

g

 i

s

 a
 p
r

in

c

ip

le

 d

ia

g

r

a

m

H

e

n

c

e

, C
N

 M
a

s

k

in

f

a

b

r

ik

 A

/

S

 c
a

n

n

o

t

 b
e

 

m

a

d

e

 r
e

s

p

o

n

s

ib

le

 f
o

r

 f
a

u

lt

s

, e
r

r

o

r

s

 

o

r

 l

o

s

s

e

s

 b
a

s

e

d

 o
n

 t
h

is

 d
ia

g

r

a

m

.

C

h

e

c

k

 

v

a

l

v

e

 
 

 


background image

Page  20

M
A

S

K

IN

F

A

B

R

IK

 A

/S

S

k

o

v

k

k

e

v

e

4

T

is

e

t

6

5

1

0

 G

ra

m

T

lf

7

4

 8

2

 1

9

 1

9

T

h

is

 d
r

a

w

in

g

 i

s

 a
 p
r

in

c

ip

le

 d
ia

g

r

a

m

H

e

n

c

e

, C
N

 M
a

s

k

in

f

a

b

r

ik

 A
/

S

 c
a

n

n

o

t

 b
e

 

m

a

d

e

 r
e

s

p

o

n

s

ib

le

 f
o

r

 f
a

u

lt

s

, e
r

r

o

r

s

 

o

r

 l

o

s

s

e

s

 b
a

s

e

d

 o
n

 t
h

is

 d
ia

g

r

a

m

.

C

h

e

c

k

 

v

a

l

v

e

 
 

 


background image

Page  21

M
A

S

K

IN

F

A

B

R

IK

 A

/S

S

k

o

v

k

k

e

v

e

4

T

is

e

t

6

5

1

0

 G

ra

m

T

lf

7

4

 8

2

 1

9

 1

9

T

h

is

 d
r

a

w

in

g

 i

s

 a
 p
r

in

c

ip

le

 d
ia

g

r

a

m

H

e

n

c

e

, C
N

 M
a

s

k

in

f

a

b

r

ik

 A
/

S

 c
a

n

n

o

t

 b
e

 

m

a

d

e

 r
e

s

p

o

n

s

ib

le

 f
o

r

 f
a

u

lt

s

, e
r

r

o

r

s

 

o

r

 l

o

s

s

e

s

 b
a

s

e

d

 o
n

 t
h

is

 d
ia

g

r

a

m

.

C

h

e

c

k

 

v

a

l

v

e