Full Text Searchable PDF User Manual
Air sampling smoke detection system
AD1-C11
Quick Guide for Commissioning
1 Installation
§
Connect power (24VDC)
§
Connect the detector line
§
Connect reset input (if S1 = ON)
§
Install the detector base and the smoke detector
§
Connect pipe system or test pipe
2 Set
Up
Set DIP switches S1 and S2 on pcb E573 according to tables below:
Air flow monitoring
switch
S2
delay time
switch
S2
range
A
B
C
D
OFF
ON
short
30 s
ON
OFF
small
I
ON
OFF
middle
2 min.
(standard)
OFF
ON
middle
II
ON
ON
long
16 min.
OFF
OFF
large
III
(standard)
OFF
OFF
very
long
128 min.
Fault
switch S1
OFF
Fault not latching
(standard)
ON
Fault latching until reset
3 Commissioning
Adjustment of the Air Flow Sensor
1.
Fix cover and tighten screws
2.
The unit must be in operation for at least 5 minutes
3.
Adjustment with adjusting peg to
0V +- 15 mV
or according to the air pressure adjustment
chart
4.
Unit ready
Fire & Security Products
Siemens Building Technologies Group
Base attachment
Detector base
only these 4 wires
will be connec ted
Meldersockel
nur diese 4 Adern
werden aufgelegt
Sockelzusatz
Connection scheme
ge
gn
br
bl
ws
sw
Anschlußschema
A
+
+
+
–
–
–
B C
E
D
F
br
ye
gr bl
bla wh
Cable lead-
through
Kabeldurch-
führung
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
internal
external
Störung
Fault
(normal)
(gestört)
(fault)
+ Reset
- Reset
Rückstellen
Reset
AD1-C11
L1-
L1+
L1+
L1-
Detector+
Detector-
+ext. Alarm
-ext. Alarm
Detector-
B
C
A
Speisung
Supply
24 VDC
0V
+24V
0V
+24V
0V
+24V
Störung
Fault
17
18
19
Siemens Building Technologies AG
Alte Landstrasse 411
CH-8708 Männedorf
Tel. +41 1 - 922 61 11
Fax +41 1 - 922 64 50
www.cerberus.ch
Document no. e4083b
Manual -
Edition 07.2001
Section -