PDF User Manual

  1. Home
  2. Manuals
  3. 360 Yield 360 Y-DROP JOHN DEERE 4710 Instruction Manual

360 Yield 360 Y-DROP JOHN DEERE 4710 Instruction Manual

360 Y-DROP HAGIE DTS 2016 +\ 360 Y-DROP JOHN DEERE 4930\ 360 Y-DROP JOHN DEERE 4940\ 360 Y-DROP JOHN DEERE 4730\ 360 Y-DROP JOHN DEERE 4830\ 360 Y-DROP HAGIE DELTA BOOM\ 360 Y-DROP APACHE

Made by: 360 Yield
Type: Instruction Manual
Category: Farm Equipment
Pages: 12
Size: 4.63 MB

 

Download PDF User Manual


Related Product Video

 

Full Text Searchable PDF User Manual



background image

INSTRUCTIONS 

360 Y-DROP

®

JOHN DEERE 4710

360 Y-DROP

®

 REGISTRATION

Please visit 

productregistration.360yieldcenter.com

 

to complete the product registration for your  

360 Y-DROP so we can better support our products 

from day one and ensure you have the latest 

upgrades, warranty parts and technical support. 

Thank you!

360YIELDCENTER.COM 

V1 - 12.22.2016

 


background image

INSTRUCTIONS 

360 Y-DROP

JOHN DEERE 4710

2

 INTRODUCTION

      Before beginning, it’s important to know where each mounting bracket fits relative 

to the row spacing involved. The 360 Y-DROP unit should be precisely centered 
on the machine, as this is critical to the assembly of the system to the sprayer and 
for mounting the system to your sprayer boom. There are, however, many boom 
variations among all sprayer models. Your sprayer may not be identical to the model 
in the following steps of the guide, and the pictures may not exactly reflect your 
model. While these steps will help you install most of your 360 Y-DROP system,  
you may need to custom-fit some components with your particular boom.

  RECOMMENDED TOOLS

     Ratchet wrench with 1/2" and 9/16" deep well sockets 
     3/8" 12-point socket
     1/2" and 9/16" combination wrenches 
     #2 Phillips screwdriver (for the shield installation)

  TORQUE VALUES

     Refer to these torque values when tightening all fasteners

  

  
    

    5/16" stainless

U-bolt

15 ft/lbs

  5/16" stainless 

Set screw

15 ft/lbs

  3/8" carbon

U-bolt

35 ft/lbs

  5/16" carbon 

U-bolt

30 ft/lbs

  5/16" carbon 

Stop bolt

30 ft/lbs

 QUESTIONS

     Call our Product Support team at 888-512-4890

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

3

ESTABLISH 

DROP LOCATIONS 

 

Figures 1 and 2

 

  Step 1

   Locate the center of the machine and 

identify the location of all the drops. On 
the sprayer boom, mark where each riser 
mount will be located. This will ensure 
that the extension tubes will not interfere 
with the riser mounts.

 

Figure 3 

  Step 2

   For the primary boom; starting at the 

wing fold pivot pin, measure out and 
make marks at 24", 86", 148", 207"  
and 267" (all measurements are ±5"). 
Repeat for the other primary boom.

 

I.

Figure 1  

Figure 2

Figure 3

24"

86"

148"

207"

267"

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

4

 INSTALL MOUNT ASSEMBLIES  

ON THE OEM PRIMARY BOOM

 

Figure 4

 

Step 1

 

 With the threads pointing down, install  
U-bolt (1) on the top of the OEM  
primary boom.   

Bag AD

 

Step 2

 

 Install bracket assembly (2) and flange 
lock nut (3).   

Hardware Kit D

 

Step 3

 

 Install extension tube (4).

 

Figure 5

 

Step 4

 

 Install boom bracket (1) onto the  
extension tube.

 

Step 5

 

 Install stop bolts (2) at both the front  
and the rear of the extension tube.  

Hardware Kit B

 

Figure 6

 

Step 6

 

 Install stainless steel set screw and  
jam nut assembly (1) onto the bracket 
assembly.  

Hardware Kit D

   Repeat Steps 1-6 for the remaining mount assemblies 

on the OEM primary boom.

II.

Figure 4  

Figure 5

Figure 6

4

1

2

3

1

1

2

1

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

5

 INSTALL MOUNT ASSEMBLIES  

ON THE OEM PRIMARY BOOM 

(CONTINUED)

 

Figure 7

   

Step 7

 

 With the U-bolt pointing to the rear, 
install the yoke mount (1) and flange  
nuts to upper boom section.

   

Step 8

 

 With the square U-bolt threads pointing 
up and using the extra thick washer and 
Nylock nut, install yoke mount (2) to the 
360 Y-DROP boom section.

  Step 9

 

 Using pins, install the yoke straps (3)  
between the upper boom and 360 
Y-DROP boom. Using the flange nuts, 
tighten the 1-1/4" carriage bolts.

   Repeat Steps 7-9 for the remaining yokes on  

the OEM primary booms. Yokes should be spaced 
approximately 60" (±5”) apart.

II.

Figure 7  

1

2

3

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

6

INSTALL CENTER SECTION  

SQUARE TUBE

 

Figure 8

 

Step 1

   Install u-bolt (1) and 14" top  

plate (2) using the supplied hardware.

 

Step 2

     Install  bracket  assemblies  (3).

 

Figure 9

 

Step 3

  

Install extension tube (1).

 

Step 4

   Install 360 Y-DROP boom bracket (2)  

on extension tube (1).    

Bag BB

 

Step 5

   Install stop bolt assemblies (3).   

Hardware Kit B within Bag BB

 

Step 6

   Install set screws (4) on bracket 

assemblies.   

Hardware Kit D within the Center Section Kit

 

Figure 10

 

Step 7

   Install set screw (1) on Y-DROP boom 

bracket.   

Hardware Kit D within the Center Section Kit

   Repeat steps 1-7 for the remainder of the  

center section square tube.

III.

Figure 8  

Figure 9

Figure 10

1

1

2

1

3

3

4

2

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

7

 INSTALL 360 Y-DROP  

BOOM

 

Figure 11

 

Step 1

   Assemble 5' boom sections (1) using the  

8" boom connectors (2) and the supplied 
hardware. 

Hardware Bag CC

 

Step 2

    Repeat Step 1 as needed in order to  

assemble the entire 360 Y-DROP boom.

 

Step 3

    Set the 360 Y-DROP boom assembly  

onto boom bracket (3). 

   Repeat Steps 1 -3 for the remaining boom assemblies.

 

 

 

 CAUTION:  The 360 Y-DROP boom assembly may 
weigh up to 150 lbs. (68 kg). Exercise caution and 
enlist help for this process.

 

Figure 12

  

Step 4

   In order to span the full length of the  

center section 360 Y-DROP boom, you  
will need to cut and drill one of the 5'  
boom sections to 1'. Mount this 1' section 
between two full 5' boom sections. Drill a 
7/16" through hole centered 2" from the 
outside edge.

 

Figures 13 and 14

  

Step 5

   Install square U-bolt (1), the 5/16" extra 

thick washers, and the 5/16" nuts over  
the 360 Y-DROP boom (2). 

Hardware Kit A

 

 

Step 6

   Install stop bolt (3) at both the front and 

the rear of the extension tube. Repeat for 
remaining stop bolts. 

Hardware Kit B

 

 

Step 7

   Install stainless steel set screw and  

jam nut assembly (4). See Figures 13 and 
14 for detail. Repeat for the remaining 
mount assemblies on the primary boom.

IV.

Figure 11

Figure 12

Figure 13

Figure 14

1

2

4

4

3

3

1

2

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

8

 INSTALL BREAKAWAY ASSEMBLY - 

ONE PIECE

 

Figure 15

 

Step 1

   Install breakaway assembly - one piece (1) 

using the square U-bolts (2) and the extra 
thick washer and Nylock nut. Repeat for 
the remaining breakaway assemblies - 
one piece. 

Hardware Kit C

 

NOTE: The alignment and quantity of the mounts 

  will depend on your row spacing.

 

Figure 16

 

Step 2

   Install riser tube assembly (1) into the 

breakaway assembly - one piece (2).

 

Step 3

  Install pin (3).

   Repeat Steps 2 and 3 for the remaining riser tube 

assemblies.

NOTE: Included in most sprayer mount packages 
are standard riser mounts to be used when primary 
booms are folded and in transport mode.   These 
standard riser mounts should be mounted in 
locations that allow you to relocate the drops away 
from potential tire interference.  See “Install Riser 
Mounts Without Breakaway Assemblies” section on 
next page for more instructions.  

V.

Figure 15  

Figure 16

1

2

2

3

1

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

9

 INSTALL RISER MOUNTS WITHOUT 

BREAKAWAY ASSEMBLIES 

(OPTIONAL)

 

Figure 17

 

Step 1

   Install riser mount (1) using the square 

U-bolts (2) and the extra thick washer 
and nylock nut. Repeat for the remaining 
riser mounts. 

Hardware Kit C

 

Figure 18

   Figure 18 may show more or fewer riser mounts 

than your installation. The alignment and quantity 
of the riser mounts will depend on your row spacing.

 

Figure 19

 

Step 2

   Install riser tube assembly (1) into the 

riser mount (2).

 

Step 3

  Install pin (3).

   Repeat Steps 2 and 3 for the remaining riser tube 

assemblies.

V.

Figure 17  

Figure 18

Figure 19

1

2

2

3

1

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

10

Figure 20  

Figure 21

Figure 22

INSTALL SHIELDS AND  

RISER HOSES

 

Figure 20

 

Step 1

  Install shield (1) onto riser tube (2).

 

Figure 21

 

Step 2

    Install base unit (1) onto riser tube (2).

 

Figure 22

 

Step 3

   Assemble drag hoses (1) to 360 Y-DROP 

base and secure with hose clamps (2).

 

Figure 23

 

Step 4

   Note the orientation of the drag hose 

clamps. The tails should point inward.

VI.

Figure 23  

2

2

1

1

2

1

 


background image

INSTRUCTIONS 360 Y-DROP

JOHN DEERE 4710

360YIELDCENTER.COM

All other trademarks are the property of 360 Yield Center, its affiliates and/or its licensors.  

©2016 360 Yield Center. All rights reserved. 

Figure 24

Figure 25

Figure 26

INSTALL SHIELDS AND  

RISER HOSES 

(CONTINUED)

 

 

Figure 24

 
 
 
 

 

 CAUTION:  Do NOT use a drill or impact driver  
for Steps 5 and 6.

 

Step 5

   Install two ½" screws (1).

 

Step 6

  Install two ¾" screws (2).

 

Step 7

  Install rubber washer (3) into the “Y”.

 

Figure 25

 

Step 8

   Install riser hose assembly (1) into the “Y”. 

 

Figure 26

 

Step 9

   Route riser hose assembly (1) as shown  

in Figure 26. 

 

Step 10

   Install the riser hose assembly to the  

OEM nozzle body.

 

Step 11

   Use 3 equally spaced plastic ties to  

secure the riser hose assembly.

   Repeat Steps 1-11 for the remaining  

360 Y-DROP Shields.

VI.

  INSTALLATION COMPLETE.

1

1

1

1

3

2