PDF User Manual

  1. Home
  2. Manuals
  3. 360 Yield 360 Y-DROP HAGIE STS 80 Instruction Manual

360 Yield 360 Y-DROP HAGIE STS 80 Instruction Manual

360 Y-DROP HAGIE STS 90\ 360 Y-DROP HAGIE STS 100

Made by: 360 Yield
Type: Instruction Manual
Category: Farm Equipment
Pages: 11
Size: 4.13 MB

 

Download PDF User Manual


Related Product Video

 

Full Text Searchable PDF User Manual



background image

INSTRUCTIONS 

360 Y-DROP

®

 

HAGIE STS 80', 90' & 100' STEEL BOOMS 

360 Y-DROP

®

 REGISTRATION

Please visit 

productregistration.360yieldcenter.com

 

to complete the product registration for your  

360 Y-DROP so we can better support our products 

from day one and ensure you have the latest 

upgrades, warranty parts and technical support. 

Thank you!

360YIELDCENTER.COM 

V1 - 11.30.2016

 


background image

INSTRUCTIONS 

360 Y-DROP 

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 INTRODUCTION

      Before beginning, it’s important to know where each mounting bracket fits relative 

to the row spacing involved. The 360 Y-DROP unit should be precisely centered 
on the machine, as this is critical to the assembly of the system to the sprayer and 
for mounting the system to your sprayer boom. There are, however, many boom 
variations among all sprayer models. Your sprayer may not be identical to the model 
in the following steps of the guide, and the pictures may not exactly reflect your 
model. While these steps will help you install most of your 360 Y-DROP system, 
you may need to custom-fit some components with your particular boom.

  RECOMMENDED TOOLS

     Ratchet wrench with 1/2" and 9/16" deep well sockets 
     3/8" 12-point socket
     1/2" and 9/16" combination wrenches 
     #2 Phillips screwdriver (for the shield installation)

  TORQUE VALUES

     Refer to these torque values when tightening all fasteners

  

  
    

    5/16" stainless

U-bolt

15 ft/lbs

  5/16" stainless 

Set screw

15 ft/lbs

  3/8" carbon

U-bolt

35 ft/lbs

  5/16" carbon 

U-bolt

30 ft/lbs

  5/16" carbon 

Stop bolt

30 ft/lbs

 QUESTIONS

     Call our Product Support team at 888-512-4890

2

 


background image

ESTABLISH  

DROP LOCATIONS 

 

Figures 1 and 2

 

Step 1

   Locate the center of the machine and 

identify the location of all the drops. On 
the sprayer boom, mark where each riser 
mount will be located. This will ensure 
that the extension tubes will not interfere 
with the riser mounts.

 

Figure 3

 

Step 2

   From the center, measure out 51" (±5") on 

either side, as shown in Figure 3.  
NOTE: The center mounting position will 
have to be offset in order to eliminate  
conflict with the center riser mount.

 

Step 3

   For the primary boom; starting at the 

wing fold pivot pin, measure out and 
make marks at 50", 104", 168", 223" and 
272" (all measurements are ±5"). Repeat 
for the other primary boom.

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

I.

Figure 2

Figure 3

360YIELDCENTER.COM

3

Figure 1  

 


background image

 INSTALL PRIMARY BOOM SPRAYER 

MOUNT PACKAGE

 

Figure 4

 

Step 1

   With the threads pointing down, install 

diamond U-bolt (1) on the top side of the 
OEM primary boom.

Bag AC

 

Step 2

   Install diamond boom clamp (2) on the 

bottom of the OEM primary boom.

 

Step 3

   Install bracket assembly (3) and the  

flange lock nut (4). 

Hardware Kit D

 

Step 4

   Install extension tube (5).

   Repeat Steps 1-4 for the the other OEM  

mount bracket.

 

Figure 5

 

Step 5

   Install boom bracket (1) onto extension 

tube (2).

II.

Figure 4  

Figure 5

360YIELDCENTER.COM

4

2

1

2

3

1

4

5

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

INSTALL CENTER SECTION  

EXTENSION TUBE

 

Figures 6 and 7

 

Step 1

   With the threads pointing down, install 

4" diamond U-bolt (1) over the OEM 
center section boom.

 

Step 2

   Position diamond boom clamp (2), 14"  

top plate (3), bracket assembly (4) as 
shown in Figure 7, and install the 3/8" 
flange nuts (5). 

  Step 3

   Install extension tube (6) onto bracket 

assembly (4).

 

Step 4

   Install boom bracket (7). 

 

Figure 8

 

Step 5

   Install a carriage bolt and nut (1) on  

the front and rear of the 14” top plate.

 

Step 6

   Install stainless steel set screw and  

jam nut assembly (2). 

III.

Figure 6  

Figure 7

Figure 8

360YIELDCENTER.COM

5

1

6

7

4

1

2

2

5

3

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

INSTALL 360 Y-DROP  

BOOM

 

Figure 9

 

Step 1

   Assemble 5' boom sections (1) utilizing 

8" boom connectors (2) and the supplied 
hardware. 

Hardware Bag CC

 

Step 2

    Repeat Step 1 as needed in order to  

assemble the entire 360 Y-DROP boom.

 

Step 3

    Set the 360 Y-DROP boom assembly onto  

boom bracket (3). 

   Repeat Steps 1 -3 for the remaining boom assemblies.

 

 

 

 CAUTION:  The 360 Y-DROP boom assembly may 
weigh up to 150 lbs. (68 kg). Exercise caution and 
enlist help for this process.

 

Figure 10

  

Step 4

   In order to span the full length of the  

center section 360 Y-DROP boom, you  
will need to cut and drill one of the 5'  
boom sections to 1'. Mount this 1' section 
between two full 5' boom sections. Drill a 
7/16" through hole centered 2" from the 
outside edge.

 

Figures 11 and 12

  

Step 5

   Install square U-bolt (1), the 5/16" extra 

thick washers, and the 5/16" nuts over  
the 360 Y-DROP boom (2). 

Hardware Kit A

 

 

Step 6

   Install stop bolt (3) at the both the front 

and the rear of the extension tube.  
Repeat for remaining stop bolts. 

Hardware Kit B

 

 

Step 7

   Install stainless steel set screw and  

jam nut assembly (4). See Figure 12 for  
detail. Repeat for the remaining mount  
assemblies on the primary boom.

IV.

360YIELDCENTER.COM

6

Figure 9  

Figure 10

Figure 11

Figure 12

1

2

4

4

3

3

1

2

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

360YIELDCENTER.COM

7

 INSTALL BREAKAWAY ASSEMBLY - 

ONE PIECE

 

Figure 13

 

Step 1

   Install breakaway assembly - one piece (1) 

using the square U-bolts (2) and the extra 
thick washer and Nylock nut. Repeat for 
the remaining breakaway assemblies - 
one piece. 

Hardware Kit C

 

Figure 14

   Figure 14 may show more or fewer mounts than 

your installation. The alignment and quantity of the 
mounts will depend on your row spacing.

 

Figure 15

 

Step 2

   Install riser tube assembly (1) into the 

breakaway assembly - one piece (2).

 

Step 3

  Install pin (3).

   Repeat Steps 2 and 3 for the remaining riser tube 

assemblies.

NOTE: Included in most sprayer mount packages 
are standard riser mounts to be used when primary 
booms are folded and in transport mode.   These 
standard riser mounts should be mounted in 
locations that allow you to relocate the drops away 
from potential tire interference.  See “Install Riser 
Mounts Without Breakaway Assemblies” section on 
next page for more instructions.  

V.

Figure 13  

Figure 14

Figure 15

1

2

2

3

1

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

360YIELDCENTER.COM

8

 INSTALL RISER MOUNTS WITHOUT 

BREAKAWAY ASSEMBLIES 

(OPTIONAL)

 

Figure 16

 

Step 1

   Install riser mount (1) using the square 

U-bolts (2) and the extra thick washer 
and nylock nut. Repeat for the remaining 
riser mounts. 

Hardware Kit C

 

Figure 17

   Figure 17 may show more or fewer riser mounts 

than your installation. The alignment and quantity 
of the riser mounts will depend on your row spacing.

 

Figure 18

 

Step 2

   Install riser tube assembly (1) into the 

riser mount (2).

 

Step 3

  Install pin (3).

   Repeat Steps 2 and 3 for the remaining riser tube 

assemblies.

V.

Figure 16  

Figure 17

Figure 18

1

2

2

3

1

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

360YIELDCENTER.COM

9

Figure 19  

Figure 20 

Figure 21

Figure 22

INSTALL SHIELDS AND  

RISER HOSES

 

Figure 19

 

Step 1

  Install shield (1) onto riser tube (2).

 

Figure 20

 

Step 2

    Install base unit (1) onto riser tube (2).

 

Figure 21

 

Step 3

   Assemble drag hoses (1) to 360 Y-DROP 

base and secure with hose clamps (2).

 

Figure 22

 

Step 4

   Note the orientation of the drag hose 

clamps. The tails should point inward.

VI.

2

2

1

1

2

1

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

 


background image

360YIELDCENTER.COM

All other trademarks are the property of 360 Yield Center, its affiliates and/or its licensors.  

©2016 360 Yield Center. All rights reserved.

Figure 23  

Figure 24

Figure 25

Figure 26

INSTALL SHIELDS AND  

RISER HOSES 

(CONTINUED)

 

 

Figure 23

 
 

 

 

 CAUTION:  Do NOT use a drill or impact driver  
for Steps 5 and 6.

 

Step 5

   Install two ½" screws (1).

 

Step 6

  Install two ¾" screws (2).

 

Figure 24

 

Step 7

  Install rubber washer (3) into the “Y”.

 

Figure 25

 

Step 8

   Install riser hose assembly (1) into the “Y”. 

 

Figure 26

 

Step 9

   Route riser hose assembly (1) as shown  

in Figure 23. 

 

Step 10

   Install the riser hose assembly to the  

OEM nozzle body.

 

Step 11

   Use 3 equally spaced plastic ties to  

secure the riser hose assembly.

   Repeat Steps 1-11 for the remaining shield assemblies.

VI.

  INSTALLATION COMPLETE.

1

1

1

1

1

2

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS